SECTION 5 - BASIC HYDRAULIC INFORMATION & HYDRAULIC SCHEMATICS
5-170
3121619
5.10 DRIVE & FUNCTION PUMP START UP
PROCEDURES
Start-Up Procedure
The Boom Lift utilizes a Triple Combination Pump coupled to
the Deutz diesel engine. The pumps are connected in-line to
each other as follows:
1.
The front hydrostatic transmission pump, or drive pump,
is coupled directly to the diesel engine and provides oil
flow to operate the machine's right side wheels.
2.
The middle hydrostatic transmission pump, or drive
pump, is coupled to the back of the front pump and pro-
vides oil flow to operate the machine's left side wheels.
3.
The third or rear pump is the function pump. It is cou-
pled to the back of the middle pump and provides oil
flow to operate the boom, axle, steer and platform func-
tions.
The transmission pumps share some common connections.
Each pumps charge oil suction ports are connected by steel
tubing, the charge pumps discharge oil flows are connected
and flow to a common charge pump inline oil filter, cleaned &
filtered oil flows back to the transmission pumps "G" ports. The
pumps case drain ports are connected (T1 & T2), oil flow from
the middle pumps T1 port also provides flows to the oil cooler.
The charge pumps oil pressure is regulated by a single boost
oil pressure relief valve installed in the middle pump. The front
pump has an orifice cartridge (0.047" diameter) installed in
place of a charge oil pressure relief cartridge. This insures that
only one valve controls charge pressure & provides an amount
of charge oil flow to the front pump's case to insure flushing &
removal of hot oil.
Each pump has its own separate electrical proportional direc-
tional control valve to control oil flow and direction. The sig-
nals or command values to each pump are similar except
when steering. During steering and propel of the machine the
pump supplying oil to the "inside turning radius" has a com-
mand less than the pump supplying oil flow to the "outside
turning radius" pump.
"Posi-Traction" control, front to rear on a given side of the
machine, is accomplished by a flow divider/combiner car-
tridge installed in the Traction Control Manifold. There is a flow
divider/combiner for each side. Each flow divider/combiner
also has a "bleed orifice" to limit the amount of flow splitting
or combining.
The middle transmission pump also supplies oil to a hot oil
flushing valve cartridge, #120, in the Traction Control Mani-
fold. This cartridge provides a means to obtain brake release
oil pressure. The brake release pressure is controlled by a pres-
sure relief valve cartridge # 130 and a solenoid operated brake
release directional control cartridge, #170, also located in the
Traction Control Manifold. This is important to note as the
brake release oil pressure must be set 25 psi (1.7 bar) below
the boost oil pressure relief valve. If the brake release pressure
is set too low, brake drag and pump control will be affected. If
set too high, damage to the wheel drive parking brakes could
result. Prior to start, connect appropriate pressure gauges to
the unit.
FOR THE START-UP OF NEW OR OVERHAULED INSTALLA-
TIONS:
1.
Insure all electrical checks have been performed & the
machine is set up correctly with the JLG Analyzer.
2.
Insure the machine has all four wheels jacked & blocked
off the ground per JLG procedures.
3.
Insure the triple pump assembly is installed and con-
nected correctly per the hydraulic circuit diagram.
4.
Disconnect the electrical connector from the diesel's
throttle actuator, to prevent engine start.
5.
Crank the engine until charge pressure reaches 50 psi or
more.
6.
Re-connect throttle actuator electrical connector and
start engine. Allow engine to run at idle speed only for at
least 5 minutes. This will allow the hydrostatic system to
filled.
7.
Listen for any abnormal noises.
8.
Check for oil leaks.
9.
Check charge pressure (500 psi +50psi, - 0 psi [34.4 bar
+3.4 bar, - 0 bar]). Pressure can be measured a pump
ports Ma & Mb or by "teeing" into the inlet for the
charge oil filter. Charge pressure is checked with the joy-
stick in neutral. A 0-1000 psi (0-70 bar) pressure gauge
must be used. (If pressure gauges were installed in Ma &
Mb to check charge pressure, disconnect the gauges
installed in Ma & Mb, as they will be damaged if loop
pressure rises above 1000 psi [34.4 bar].)
Summary of Contents for 1850SJ
Page 1: ...Service and Maintenance Manual Model 1850SJ 3121619 June 29 2018 Rev J AS NZS...
Page 2: ......
Page 21: ...3121619 xvii LIST OF FIGURES FIGURE NO TITLE PAGE NO Thispageleftblankintentionally...
Page 24: ...xx 3121619 LIST OF TABLES TABLE NO TITLE PAGE NO Thispageleftblankintentionally...
Page 50: ...SECTION 2 GENERAL 2 12 3121619 NOTES...
Page 55: ...SECTION 3 CHASSIS TURNTABLE 3121619 3 5 This page left blank intentionally...
Page 56: ...SECTION 3 CHASSIS TURNTABLE 3 6 3121619 Figure 3 4 Axle Hose Routing Sheet 1 of 2...
Page 57: ...SECTION 3 CHASSIS TURNTABLE 3121619 3 7 Figure 3 5 Axle Hose Routing Sheet 2 of 2...
Page 58: ...SECTION 3 CHASSIS TURNTABLE 3 8 3121619 Figure 3 6 Steering Axle Hydraulic Circuit...
Page 61: ...SECTION 3 CHASSIS TURNTABLE 3121619 3 11 Figure 3 9 Turntable Hydraulic System...
Page 92: ...SECTION 3 CHASSIS TURNTABLE 3 42 3121619 Figure 3 39 Swing Bearing Wear Tolerance...
Page 94: ...SECTION 3 CHASSIS TURNTABLE 3 44 3121619 Figure 3 41 Swing Bearing Removal Sheet 2 of 4...
Page 110: ...SECTION 3 CHASSIS TURNTABLE 3 60 3121619 Figure 3 54 Engine Electrical Circuit...
Page 169: ...SECTION 4 BOOM PLATFORM 3121619 4 7 Figure 4 1 Boom Hydraulic System...
Page 173: ...SECTION 4 BOOM PLATFORM 3121619 4 11 Figure 4 2 Boom Assembly Sheet 1 of 9...
Page 174: ...SECTION 4 BOOM PLATFORM 4 12 3121619 Figure 4 3 Boom Assembly Sheet 2 of 9...
Page 175: ...SECTION 4 BOOM PLATFORM 3121619 4 13 Figure 4 4 Boom Assembly Sheet 3 of 9...
Page 176: ...SECTION 4 BOOM PLATFORM 4 14 3121619 Figure 4 5 Boom Assembly Sheet 4 of 9...
Page 177: ...SECTION 4 BOOM PLATFORM 3121619 4 15 Figure 4 6 Boom Assembly Sheet 5 of 9...
Page 178: ...SECTION 4 BOOM PLATFORM 4 16 3121619 Figure 4 7 Boom Assembly Sheet 6 of 9...
Page 179: ...SECTION 4 BOOM PLATFORM 3121619 4 17 Figure 4 8 Boom Assembly Sheet 7 of 9...
Page 180: ...SECTION 4 BOOM PLATFORM 4 18 3121619 Figure 4 9 Boom Assembly Sheet 8 of 9...
Page 181: ...SECTION 4 BOOM PLATFORM 3121619 4 19 Figure 4 10 Boom Assembly Sheet 9 of 9...
Page 187: ...SECTION 4 BOOM PLATFORM 3121619 4 25 Figure 4 16 Boom Assembly Torque Values Sheet 1 of 4...
Page 188: ...SECTION 4 BOOM PLATFORM 4 26 3121619 Figure 4 17 Boom Assembly Torque Values Sheet 2 of 4...
Page 189: ...SECTION 4 BOOM PLATFORM 3121619 4 27 Figure 4 18 Boom Assembly Torque Values Sheet 3 of 4...
Page 190: ...SECTION 4 BOOM PLATFORM 4 28 3121619 Figure 4 19 Boom Assembly Torque Values Sheet 4 of 4...
Page 201: ...SECTION 4 BOOM PLATFORM 3121619 4 39 Figure 4 20 Hose Adjustment...
Page 202: ...SECTION 4 BOOM PLATFORM 4 40 3121619 Figure 4 21 Section 3 Boom Cables...
Page 203: ...SECTION 4 BOOM PLATFORM 3121619 4 41 Figure 4 22 Section 4 Boom Cables...
Page 204: ...SECTION 4 BOOM PLATFORM 4 42 3121619 Figure 4 23 Section 5 Boom Cables...
Page 205: ...SECTION 4 BOOM PLATFORM 3121619 4 43 Figure 4 24 Jib Hydraulics Sheet 1 of 7...
Page 234: ...SECTION 4 BOOM PLATFORM 4 72 3121619 Figure 4 44 Powertrack Shimming Instructions...
Page 239: ...SECTION 4 BOOM PLATFORM 3121619 4 77 Figure 4 49 Powertrack Hose Installation Sheet 1 of 4...
Page 240: ...SECTION 4 BOOM PLATFORM 4 78 3121619 Figure 4 50 Powertrack Hose Installation Sheet 2 of 4...
Page 241: ...SECTION 4 BOOM PLATFORM 3121619 4 79 Figure 4 51 Powertrack Hose Installation Sheet 3 of 4...
Page 242: ...SECTION 4 BOOM PLATFORM 4 80 3121619 Figure 4 52 Powertrack Hose Installation Sheet 4 of 4...
Page 252: ...SECTION 4 BOOM PLATFORM 4 90 3121619 NOTES...
Page 432: ...SECTION 5 BASIC HYDRAULIC INFORMATION HYDRAULIC SCHEMATICS 5 180 3121619 NOTES...
Page 527: ...SECTION 6 JLG CONTROL SYSTEM 3121619 6 95 Figure 6 36 LSS Installation Sheet 1 of 4...
Page 528: ...SECTION 6 JLG CONTROL SYSTEM 6 96 3121619 Figure 6 37 LSS Installation Sheet 2 of 4...
Page 529: ...SECTION 6 JLG CONTROL SYSTEM 3121619 6 97 Figure 6 38 LSS Installation Sheet 3 of 4...
Page 530: ...SECTION 6 JLG CONTROL SYSTEM 6 98 3121619 Figure 6 39 LSS Installation Sheet 4 of 4...
Page 710: ...SECTION 7 BASIC ELECTRICAL INFORMATION ELECTRICAL SCHEMATICS 7 118 3121619 NOTES...
Page 711: ......