SECTION 7 - GENERAL ELECTRICAL INFORMATION & SCHEMATICS
7-8
31215079
3. After all required contacts have been inserted, the
wedge lock must be closed to its locked position.
Release the locking latches by squeezing them
inward (See Figure 7-8., Connector Assembly (3 of 4)).
4. Slide the wedge lock into the housing until it is flush
with the housing (See Figure 7-9., Connector Assem-
bly (4 of 4)).
Figure 7-8. Connector Assembly (3 of 4)
Figure 7-9. Connector Assembly (4 of 4)
Go
to
Discount-Equipment.com
to
order
your
parts