SECTION 4 - BOOM & PLATFORM
3121290
– JLG Lift –
4-3
Main Boom Assembly
1.
Install power track to the attach point on the base boom
section. Secure power track with the attaching hard-
ware.
2.
Install hydraulic lines and electrical cables in power
track.
3.
Install wear pads to the aft end of the fly section.
4.
Using suitable lifting equipment, slide fly section into
the base section until power track attach point aligns
with holes in side of base section.
5.
Attach power track to aft end of fly boom section.
Secure power track with attaching hardware.
6.
Using suitable lifting equipment, slide fly boom section
out to gain access to telescope cylinder attach pin hole.
7.
Measure distance between telescope cylinder port
block attach point on base boom section and attach
point on fly boom section.
8.
Connect a suitable auxiliary hydraulic power source to
telescope cylinder port block.
9.
Extend telescope cylinder the distance of the two attach
points.
10.
Secure sling and lifting device at telescope cylinder’s
approximate center of gravity. Lift cylinder to aft end of
boom assembly.
WHEN INSERTING TELESCOPE CYLINDER INTO BOOM, CARE MUST BE TAKEN
NOT TO DAMAGE POWER TRACK ASSEMBLY.
11.
Slowly slide telescope cylinder into boom assembly
Align rod end with attach point in fly section. Insert pin
and secure with retaining ring.
12.
Align bolt holes at aft end of base boom section with
telescope cylinder port block. Secure telescope cylinder
with hardware.
13.
Install wear pads at end of base boom section. Using
shims, adjust adjustable wear pads to zero clearance.
Adjust pads alternately side to side, so fly boom section
is centered in base boom section.
14.
Retract boom section fully. Using shims, adjust wear
pads at aft end of boom section to zero clearance.
Adjust pads alternately side to side, so fly boom section
is centered in base boom section.
15.
Disconnect auxiliary power source from telescope cylin-
der.
Install Boom Assembly
1.
Using suitable lifting equipment, position boom assem-
bly on turntable so boom pivot holes in boom and turn-
table are aligned.
2.
Install boom pivot pin, ensuring location of hole in pivot
pin aligns with attach point on upright.
3.
Using all applicable safety precautions, operate lifting
equipment to position boom lift cylinder and level link
so holes in cylinder rod end and level link are aligned
with one in turntable. Insert cylinder pins.
4.
If necessary, gently tap pins into position with a soft
headed mallet. Ensure attach holes in pins are aligned
with attach holes in boom structure. Secure with hard-
ware.
5.
Connect all hoses and wiring.
6.
Install platform to boom assembly.
7.
Connect hoses and wiring at platform control station.
8.
Using all safety precautions, operate machine systems
and extend and retract boom for four or five cycles.
9.
Shut down machine systems and check for leaks.
Summary of Contents for 450A II Series
Page 46: ...SECTION 3 CHASSIS TURNTABLE 3 6 JLG Lift 3121290 Figure 3 4 Drive Hub 4WD Front Only ...
Page 79: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 39 Figure 3 32 Swing Bearing Drive ...
Page 101: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 61 Figure 3 42 Auxiliary Pump ...
Page 113: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 73 Figure 3 53 EMR2 Fault Codes Sheet 1 of 5 ...
Page 114: ...SECTION 3 CHASSIS TURNTABLE 3 74 JLG Lift 3121290 Figure 3 54 EMR2 Fault Codes Sheet 2 of 5 ...
Page 115: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 75 Figure 3 55 EMR2 Fault Codes Sheet 3 of 5 ...
Page 116: ...SECTION 3 CHASSIS TURNTABLE 3 76 JLG Lift 3121290 Figure 3 56 EMR2 Fault Codes Sheet 4 of 5 ...
Page 117: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 77 Figure 3 57 EMR2 Fault Codes Sheet 5 of 5 ...
Page 159: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 119 ...
Page 161: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 121 ...
Page 163: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 123 ...
Page 165: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 125 ...
Page 173: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 133 Sensor Transducer Type ...
Page 177: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 137 Sensor Transducer Type ...
Page 179: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 139 ...
Page 181: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 141 ...
Page 183: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 143 ...
Page 185: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 145 ...
Page 187: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 147 ...
Page 203: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 163 ...
Page 207: ...SECTION 3 CHASSIS TURNTABLE 3121290 JLG Lift 3 167 ...
Page 217: ...SECTION 4 BOOM PLATFORM 3121290 JLG Lift 4 5 Figure 4 2 Boom Limit Switches ...
Page 310: ...SECTION 5 HYDRAULICS 5 70 JLG Lift 3121290 NOTES ...
Page 312: ...SECTION 6 JLG CONTROL SYSTEM 6 2 JLG Lift 3121290 Figure 6 2 Controller Block Diagram 0 ...
Page 370: ...SECTION 6 JLG CONTROL SYSTEM 6 60 JLG Lift 3121290 NOTES ...
Page 394: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 24 JLG Lift 3121290 NOTES ...
Page 395: ......