SECTION 3 - CHASSIS, PLATFORM, & SCISSOR ARMS
31215923
3-31
Output Carrier Disassembly
1. Drive the roll pin (4G) into the planet shaft (4E) until it
bottoms against the carrier (3A) using a 1/8" diame-
ter punch.
2. Using a soft face hammer, tap the planet shaft (4E)
out of the carrier (4A).
3. Drive the roll pin (4G) out of the planet shaft (4E)
using a 1/8" diameter punch.
NOTE:
The roll pins (4G) should not be reused when reas-
sembling the unit.
4. Slide the planet gear sub-assembly (4) out of the out-
put carrier (4A) carefully so that the needle bearings
do not drop during the process.
3A. Carrier
4. Planet Gear Sub-Assembly
4A. Output Carrier
4B. Thrust Washers
4C. Needle Rollers
4D. Thrust Spacer
4E. Planet Shaft
4F. Planet Gears
4G. Roll Pin
4H. Thrust Washer
Figure 3-9. Output Carrier Disassembly
Summary of Contents for ERT2669
Page 2: ......
Page 4: ...INTRODUCTION A 2 31215923 REVISON LOG Original Issue A January 08 2021...
Page 12: ...viii 31215923 TABLE OF CONTENTS...
Page 40: ...SECTION 1 SPECIFICATIONS 1 22 31215923...
Page 58: ...SECTION 2 GENERAL 2 18 31215923...
Page 187: ...SECTION 4 BASIC HYDRAULIC INFORMATION SCHEMATICS 31215923 4 11...
Page 206: ...SECTION 4 BASIC HYDRAULIC INFORMATION SCHEMATICS 4 30 31215923...
Page 225: ...SECTION 4 BASIC HYDRAULIC INFORMATION SCHEMATICS 31215923 4 49...
Page 242: ...SECTION 4 BASIC HYDRAULIC INFORMATION SCHEMATICS 4 66 31215923...
Page 307: ...SECTION 5 JLG CONTROL SYSTEM 31215923 5 65...
Page 334: ...SECTION 6 LSS SETUP CALIBRATION SERVICE 6 12 31215923...
Page 362: ...SECTION 7 GENERAL ELECTRICAL INFORMATION SCHEMATICS 7 28 31215923...
Page 374: ...SECTION 7 GENERAL ELECTRICAL INFORMATION SCHEMATICS 7 40 31215923...
Page 375: ......