background image

CIRCUIT DIAGRAM - HYDRAULIC

19

Relief Valve preset to 

65 Bar

12V DC Powerpack

Single Action
2 stage lift cylinder

Manual Bypass

Solenoid Lock Valve

NA-HP-003 Steel Pipe

Orifice

Courtesy of Crane.Market 

Summary of Contents for Power Towers Nano

Page 1: ...Operating and Maintenance Manual www powertowers com Courtesy of Crane Market...

Page 2: ...ork from The Nano eliminates many of the risks associated with portable scaffold towers The Nano is suitable for any application provided it is used within its specified operating parameters If used f...

Page 3: ...Maximum total weight Inc payload 485 kg Maximum castor point load 180 kgs 1 77 kN Max wheel force 1 75 kN Closed Dimensions Length 1 195 m Width 0 750 m Height 1 560 m Weight 285 kg Power Source Stand...

Page 4: ...he Nano on sloping or uneven ground 3 Never use the Nano as a goods lift or crane 4 Never exceed horizontal forces never use in wind maximum horizontal force 200N 5 Never use in the vicinity of live c...

Page 5: ...Y COMPONENTS PRIMARY COMPONENT LOCATIONS 5 Control Box Entrance Gate Latch Spirit Level Swivel Castor Auto Lok Braked Wheel Emergency Stop Battery Isolator Emergency Lowering Valve Courtesy of Crane M...

Page 6: ...Emergency operation How to lower the Nano without power or in the event of operator incapacity There is no specific legal requirement to wear a safety harness However there is an employers requiremen...

Page 7: ...achine under application Refer to working envelope diagram if necessary 1 Apply both castor brakes 2 Check spirit level to ensure machine is level 3 Ensure the emergency lowering valve is closed push...

Page 8: ...ly and ensure the green LED top of charger illuminates The adjacent amber LED has three modes C 1 Rapid flash indicates maximum charge rate Note when switching charger on the amber light must rapid fl...

Page 9: ...ly be checked when the machine is in the transport position The correct level in this condition is approximately 3 4 from the base of the tank as indicated by the line 3 Ensure there is no obvious mec...

Page 10: ...the application any failure could result in a serious accident Secondly if the bearings become tight then it will make the machine difficult to manoeuvre A measure of horizontal push force can simply...

Page 11: ...ng with a spacer washer that enables a higher bolting torque to be applied This will improve the reliability of the fix but will not increase the strength of the castor assembly The new fixing nut and...

Page 12: ...ghly rated for the application so if visible distortion is evident a significant impact will have occurred and under these conditions the castor and fixing must be replaced Typical signs of impact whi...

Page 13: ...the lower rest buffers and the outer section continues to close over the middle section It is essential the mast closes in this sequence To ensure the mast sections move in the correct sequence and d...

Page 14: ...ondition and security Axle and wheels for condition and security Condition and operation of spirit level Condition of component and battery covers Condition of all labelling Carry out a full operation...

Page 15: ...his is not practical then the charger should be switched on once a week for half an hour This is especially important in cold conditions The hydraulic oil must be replaced recommended after 3 months o...

Page 16: ...tery Charger PT E 001 E 12V 105A Traction Battery PT E 002 F 110V Plug PT E 010 HYDRAULIC PARTS Part No G 12V DC Powerpack Complete PTN H 251 H Emergency Lowering Solenoid c w Valve PTN H 255 Emergenc...

Page 17: ...106 E Guardrails c w Gate PTN M 350 F Rubber Buffer PT M 126 G Cover Securing Knob PT M 107 H Tool Tray PTN M 303 I Buffer Wheel PTN M 302 J Decal Set complete PTN M 322 K Keys pair PTN M 341 L Gas St...

Page 18: ...OP ISOLATOR E STOP RED UNUSED BROWN VE GREEN YELLOW DOWN BLUE UP UP N O 5A MOVEMENT ALARM VE VE SUZIE CABLE 110V 230V AC SUPPLY 15A LOWERING VALVE SOLENOID 12V DC MOTOR CONTACTOR 1 POWERPACK 2 PIN CON...

Page 19: ...CIRCUIT DIAGRAM HYDRAULIC 19 Relief Valve preset to 65 Bar 12V DC Powerpack Single Action 2 stage lift cylinder Manual Bypass Solenoid Lock Valve NA HP 003 Steel Pipe Orifice Courtesy of Crane Market...

Page 20: ...t a warranty claim on any Nano or component Materials and or labour costs to renew repair or replace components due to fair wear and tear Faults arising from the use of non standard or additional part...

Page 21: ...Courtesy of Crane Market...

Page 22: ...Courtesy of Crane Market...

Page 23: ...Courtesy of Crane Market...

Page 24: ...N OP UK 11 15 4 www powertowers com 100 British designed and manufactured Powered by TCPDF www tcpdf org Courtesy of Crane Market...

Reviews: