Section 6
-
Emergency Procedures
6
-
2
31211476
6.2 EMERGENCY LOWERING OF BOOM
In the event of total loss of engine power or hydraulic pump failure with an elevated load,
the situation must be properly evaluated and dealt with on an individual basis.
Contact
JLG Industries or the local Authorized Distributor for specific instructions.
Secure the telehandler using the following procedures:
1. Clear the area around telehandler of all personnel.
2. Engage the parking brake. Place the transmission control lever in “NEUTRAL”.
3. Block all four wheels.
4. Section off a large area under the boom to restrict any personnel from entering this
area.
5. See Service Manual for information.
Summary of Contents for Skytrak 3013
Page 3: ...Revision Log a 31211476 Re v is ion L og REVISION LOG March 27 2020 A Original Issue of Manual...
Page 40: ...Section 2 Pre Operation and Inspection 2 14 31211476 This Page Intentionally Left Blank...
Page 60: ...Section 3 Controls and Indicators 3 20 31211476 This Page Intentionally Left Blank...
Page 98: ...Section 5 Attachments and Hitches 5 26 31211476 This Page Intentionally Left Blank...
Page 102: ...Section 6 Emergency Procedures 6 4 31211476 This Page Intentionally Left Blank...
Page 111: ...Section 7 Lubrication and Maintenance 7 9 31211476 This Page Intentionally Left Blank...
Page 122: ...Section 7 Lubrication and Maintenance 7 20 31211476 This Page Intentionally Left Blank...
Page 124: ...Section 8 Additional Checks 8 2 31211476 This Page Intentionally Left Blank...
Page 134: ...Inspection Maintenance and Repair Log Date Comments...