Section 4
-
Operation
4
-
9
31211476
Transporting a Suspended Load
• Travel in accordance with the requirements set forth in Section 1- General Safety
• For additional requirements, refer to the appropriate capacity chart in the operator
cab.
Important things to remember:
• Ensure the boom is fully retracted.
• Never raise the load more than 11.8 in (300 mm) above ground surface or the boom
more than 45°.
• The guide persons and operator must remain in constant communication (verbal or
hand) and be in visual contact with the operator at all times.
• Never place the guide persons between the suspended load and the telehandler.
• Only transport the load at walking speed, 0.9 mph (0.4 m/s), or less.
Leveling Procedure
1. Position machine in best location to lift or place load.
2. Apply parking brake and move transmission control lever to NEUTRAL.
3. Observe level indicator to determine whether machine must be leveled prior to
lifting load.
4. Move boom so load is no more than 11.8 in (300 mm) above ground surface and
boom/or boom is raised no more than 45°.
OW0130
O
Z
3160
Summary of Contents for Skytrak 3013
Page 3: ...Revision Log a 31211476 Re v is ion L og REVISION LOG March 27 2020 A Original Issue of Manual...
Page 40: ...Section 2 Pre Operation and Inspection 2 14 31211476 This Page Intentionally Left Blank...
Page 60: ...Section 3 Controls and Indicators 3 20 31211476 This Page Intentionally Left Blank...
Page 98: ...Section 5 Attachments and Hitches 5 26 31211476 This Page Intentionally Left Blank...
Page 102: ...Section 6 Emergency Procedures 6 4 31211476 This Page Intentionally Left Blank...
Page 111: ...Section 7 Lubrication and Maintenance 7 9 31211476 This Page Intentionally Left Blank...
Page 122: ...Section 7 Lubrication and Maintenance 7 20 31211476 This Page Intentionally Left Blank...
Page 124: ...Section 8 Additional Checks 8 2 31211476 This Page Intentionally Left Blank...
Page 134: ...Inspection Maintenance and Repair Log Date Comments...