Placing a Suspended Load
Before placing any load be sure that:
• The landing point can safely support the weight of the load.
• The landing point is level; front to back and side to side.
• Use the capacity chart to determine safe boom extension range. See
• Align load at the level load is to be placed, then position boom slowly until load is just
above area where it is to be placed.
• Ensure that the guide persons and operator remain in constant communication
(verbal or hand) when placing the load.
Disengaging a Suspended Load
• Never place the guide persons between the suspended load and the telehandler.
• Once at the destination of the load, ensure to bring the telehandler to a complete stop
and apply the park brake prior to disengagement of the lifting devices and tethers.
Summary of Contents for Skytrak 3013
Page 3: ...Revision Log a 31211476 Re v is ion L og REVISION LOG March 27 2020 A Original Issue of Manual...
Page 40: ...Section 2 Pre Operation and Inspection 2 14 31211476 This Page Intentionally Left Blank...
Page 60: ...Section 3 Controls and Indicators 3 20 31211476 This Page Intentionally Left Blank...
Page 98: ...Section 5 Attachments and Hitches 5 26 31211476 This Page Intentionally Left Blank...
Page 102: ...Section 6 Emergency Procedures 6 4 31211476 This Page Intentionally Left Blank...
Page 111: ...Section 7 Lubrication and Maintenance 7 9 31211476 This Page Intentionally Left Blank...
Page 122: ...Section 7 Lubrication and Maintenance 7 20 31211476 This Page Intentionally Left Blank...
Page 124: ...Section 8 Additional Checks 8 2 31211476 This Page Intentionally Left Blank...
Page 134: ...Inspection Maintenance and Repair Log Date Comments...