Section 5- Attachments
5-27
31211018
Installation Procedure:
• Refer to
Operation:
• Raise or lower boom to appropriate height and open pipe grapple for loading
material.
• Align and center telehandler with face of material.
• Drive slowly and smoothly into material for loading. Boom extension may be required
for loading of material in some situations.
• Center load on forks, tilt forks up far enough to retain load, close pipe grapple and
back away.
• Travel in accordance with requirements set forth in Section 1- General Safety Practices.
• Open pipe grapple and unload material from forks.
Equipment Damage Precautions:
• Except for lifting or unloading material, the boom must be fully retracted for all
operations.
• Do not use forks as a lever to pry material. Excessive prying forces could damage forks
or machine structure.
• Do not use pipe grapple as a lever to pry material. Excessive prying forces could
damage pipe grapple or machine structure.
• Do not attempt to load material which is hard or frozen. This could cause severe
damage to quick coupler or machine structure.
• Do not attempt to lift loads that are attached or connected to another object.
Summary of Contents for Skytrak 6036
Page 80: ...Section 4 Operation 4 14 31211018 This Page Intentionally Left Blank...
Page 89: ...Section 5 Attachments 5 9 31211018 This Page Intentionally Left Blank...
Page 134: ...Section 6 Emergency Procedures 6 4 31211018 This Page Intentionally Left Blank...
Page 143: ...Section 7 Lubrication and Maintenance 7 9 31211018 8042 10042 O 5731 H 50 EVERY...
Page 144: ...Section 7 Lubrication and Maintenance 7 10 31211018 10054 O 5711 H 50 EVERY...
Page 166: ...Section 8 Additional Checks 8 4 31211018 This Page Intentionally Left Blank...
Page 182: ...Index 4 31211018...
Page 184: ...Inspection Maintenance and Repair Log Date Comments...
Page 186: ......