Section 5- Attachments
5-35
31211018
Installation Procedure:
• Refer to
Operation:
• Raise or lower boom to appropriate height for loading material from stockpile.
• Align telehandler with face of stockpile and drive slowly and smoothly into pile to load
bucket.
• Tilt bucket up far enough to retain load and back away from pile.
• Travel in accordance with requirements set forth in
Section 1- General Safety Practices.
• Tilt bucket down to dump load.
Equipment Damage Precautions:
• Except for lifting or dumping a load, the boom must be fully retracted for all bucket
operations.
• Do not corner-load bucket. Distribute material evenly within the bucket. Bucket
capacity charts are for evenly distributed loads only.
• Do not use bucket as a lever to pry material. Excessive prying forces could damage
bucket or machine structure.
• Do not attempt to load material which is hard or frozen. This could cause severe
damage to quick coupler or machine structure.
• Do not use bucket for "back dragging." This could cause severe damage to quick
coupler and retraction cables/chains.
Summary of Contents for Skytrak 6036
Page 80: ...Section 4 Operation 4 14 31211018 This Page Intentionally Left Blank...
Page 89: ...Section 5 Attachments 5 9 31211018 This Page Intentionally Left Blank...
Page 134: ...Section 6 Emergency Procedures 6 4 31211018 This Page Intentionally Left Blank...
Page 143: ...Section 7 Lubrication and Maintenance 7 9 31211018 8042 10042 O 5731 H 50 EVERY...
Page 144: ...Section 7 Lubrication and Maintenance 7 10 31211018 10054 O 5711 H 50 EVERY...
Page 166: ...Section 8 Additional Checks 8 4 31211018 This Page Intentionally Left Blank...
Page 182: ...Index 4 31211018...
Page 184: ...Inspection Maintenance and Repair Log Date Comments...
Page 186: ......