SECTION 6 - JLG CONTROL SYSTEM
3121200
6-13
Ground Test
1.
Position the Platform/Ground select switch to the
Ground position.
2.
Plug the analyzer into the connector inside the Ground
control box.
3.
Pull out the Emergency Stop switch.
4.
The analyzer screen should read:
5.
Use the arrow button to reach SYSTEM TEST. Hit Enter.
The analyzer will prompt you asking if you want to acti-
vate the system test; hit Enter again to activate.
6.
Follow the flow path in Figure 6-6., System Test Flow
Chart - Ground Station Tests and go through the compo-
nent tests. Hit the ESC key during any part of the test to
return to the main menu without completing all tests or
wait until all tests are complete. During the TEST ALL
INPUTS sequence, the analyzer allows control switches
to be operated and shows if they are closed (CL) or open
(OP).
1
3
3
3
3
ESC
ENTER
MAE19060
HELP:
PRESS ENTER
Summary of Contents for T500J
Page 1: ...Service and Maintenance Manual Model T500J PN 3121200 July 25 2018 Rev I AS NZS...
Page 2: ......
Page 16: ...xii 3121200 LIST OF TABLES TABLE NO TITLE PAGE NO This page left blank intentionally...
Page 36: ...SECTION 2 GENERAL 2 8 3121200 NOTES...
Page 143: ...SECTION 3 CHASSIS TURNTABLE 3121200 3 107 Figure 3 45 Battery Charger Schematic...
Page 234: ...SECTION 5 BASIC HYDRAULIC INFORMATION SCHEMATICS 5 60 3121200 NOTES...
Page 246: ...SECTION 6 JLG CONTROL SYSTEM 6 12 3121200 Figure 6 5 System Test Flow Chart Platform Tests...
Page 304: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 3121200 NOTES...
Page 305: ......