22
Step 3: Connect the middle tube with bottom tube by screwing them together. Connect the
top tube with middle tube by screwing them together.
Step 4: Feed the Power cable through the Tubes, and pull through around 2m of cable.
Push the Heater Head onto the Top Tube and fix it in position using the 2pcs 4*l0mm screws.
Step 5: Fix the Power cable on the Iron Base by using 2pcs 6*14mm screws.