5.0 TOOLS REQUIRED FOR INSTALLATION
•
Rubber
mallet
•
Open wrench for pulley box lid 7/16”
•
Allen wrench 5/16”
•
Allen wrench 1/4”
•
Allen wrench for cable adjustment (900 bend) 3/8”
•
Wrench
3/4”
•
Wrench
7/16”
•
Wrench
11/16”
•
Vice grips for cable adjustment reg.
•
Ratchet
6”
extension
and 3/4” deep socket for pulley assembly nut reg.
•
Wire cutters for cutting airlines 3/4”
•
Wrench for hydraulic fittings reg.
•
Pliers
•
Socket for attaching the lifting superstructures to the pistons 1-7/16”
•
Work
gloves
•
3’ pry bar for manipulating cylinders
•
Level
6’
•
Tape
measure
•
Set of screwdrivers
•
Impact
gun
•
Torque
gun
•
Crain for lifting and installing cylinders
•
Funnel
•
Hammer drill or similar, 1/4” and 1/2” concrete drill bits
•
Caulking
gun
Some of the supplies required:
•
The necessary fittings for running shop air to air lift lock release button -
1/8” pipe, female
•
3-1/2 gallons ISO-32 Hydraulic oil
•
1 tube of waterproof silicone sealer20’ by 1-1/2” schedule #40 PVC pipe
and 1-1/2” PVC electrical sweep
•
Spray can of silicone lubricant
6
Summary of Contents for 40HP210ES
Page 9: ...Figure 1 Bay Layout Option A 8 ...
Page 10: ...Figure 2 Bay Layout Option B 9 ...
Page 12: ...Figure 4 Elevation 11 ...
Page 14: ...Figure 5 Cable Routing 13 ...
Page 15: ...Figure 6 Hydraulic and Air Connections 14 ...
Page 25: ...16 0 LIFT ASSEMBLY 24 ...
Page 27: ...3 1026 1 Pump Stand Bolt Down Standard Not shown in figure 26 ...
Page 28: ...17 0 POWER PACK ASSEMBLY 27 ...