6. Insulate the condensate pipe connection and the condensate hose after connecting them. If improperly
insulated, condensation can occur.
7. Insulate the condensate piping with insulation wrap as it runs through the indoor unit.
● Moisture which has discharged into the condensate pan and checked for drainage in the heating season
should be drained completely from the condensate pan.
● The heat exchanger is heated since a slight amount of refrigerant circulates inside the indoor unit during
periods of stoppage. As a result, moisture in the condensate pan evaporates, causing condensation
issues.
● After the drain check is completed, reinsert the rubber plug and seal the gap with a silicon sealant.
● Simplified Operation of Drain-up Mechanism
The following is a simplified operation procedure for the drain-up mechanism.
▫ Turn OFF the power supply.
▫ Disconnect the service connector (marked with green).
▫ Turn ON the power supply and start the simplified operation for the drain-up mechanism.
▫ Turn OFF the power supply.
▫ Reconnect the service connector.
NOTE:
Make sure to hold the connector part. Do not remove and plug in the connector frequently (more than two
or three times).
Turn off electrical power at the power supply when handling the service connector. Possibility of
an electrical shock hazard exists.
NOTICE
Terminal Blocks
PCB
Drain-up Mechanism
Service Connector
(Marked with Green)
Hose Clamp (Accessory)
Unit: inch (mm)
Completely wrap up to cover the
transparent area of the condensate pipe
end connection and the hose clamp.
Insulation
3/16T x 10-5/8 x10-5/8 (5T x 270 x 270)
(Accessory)