Operating manual- SAB 355 (including ATEX)
004059 en 2019.11
57/63
5.
When the desired amount of oil has been charged to the unit, stop the pump and close the
service valve, pos. 106.
6.
Open the ball valve, pos. 9, carefully to equalise the pressure. The hoses can now be
dismantled.
7.
Loosen the non-return valve carefully to equalise the remaining pressure. Remember to
mount the cap nut on the charge valve and to seal the oil barrel if there is any oil left.
Fig. 25: Oil charging
Fig. 26: Piping diagram for oil charging
Length: 460 mm
Height: 350 mm
Width: 340 mm
Weight: 22 kg
Part number: 4541.001
3/8”RG
1/4”RG
1/2”RG
7/8”RG
RG= Pipethread
20
7
9
5
1
2
12
5
20
2
1
B
9
7
12
M
A
106