VENT SYSTEM

This furnace is certified to be installed with one of two possible vent
configurations.

1.

Horizontal vent system. This vent system can be installed com-
pletely horizontal or combinations of horizontal, vertical, or offset
using elbows.

2.

Vertical vent system. This vent system can be installed completely
vertical or a combination of horizontal, vertical, or offset using
elbows.

VENT APPLICATIONS AND TERMINATION

When selecting the location for a combustion air / vent termination, the
following should be considered:

1.

Observe all clearances listed in vent clearances in these instruc-
tions.

2.

Termination should be positioned where vent vapors will not dam-
age plants or shrubs or air conditioning equipment.

3.

Termination should be located where it will not be affected by wind
gusts, light snow, airborne leaves or allow recirculation of flue
gases.

4.

Termination should be located where it will not be damaged or
exposed to flying stones, balls, etc.

5.

Termination should be positioned where vent vapors are not objec-
tionable.

6.

Horizontal portions of the vent system must slope upwards and be
supported to prevent sagging.

7.

Direct vent systems must be installed so the vent and the combus-
tion air pipes terminate in the same atmospheric zone. Refer to Fig-
ures 29 or 30.

VENTING MULTIPLE UNITS

Multiple units can be installed in a space or structure as either a single
pipe configuration or a two-pipe configuration.

The combustion air side of the single pipe configuration shown in Figure
28 is referred to in these instructions as ambient combustion air supply.
Follow the instructions for ambient combustion air installations, paying
particular attention to the section on air source from inside the building.
The vent for a single pipe system must be installed as specified in the
venting section of these instructions with the vent terminating as shown
in Figure 28. Each furnace must have a separate vent pipe. Under NO
circumstances can the two vent pipes be tied together.

The combustion air side of the two-pipe configuration shown in Figure
29 can be installed so the combustion air pipe terminates as described
in outdoor combustion air or ventilated combustion air sections in these
instructions. Follow the instructions for outdoor combustion air or venti-
lated combustion air and the instructions for installing the vent system
with the vent terminating as shown in Figures 31 or 32. The two-pipe
system must have a separate combustion air pipe and a separate vent
pipe for each furnace. Under NO circumstances can the two combus-
tion air or vent pipes be tied together. The combustion air and vent
pipes must terminate in the same atmospheric zone.

 

 FIGURE 28:  

Termination Configuration - 1 Pipe

 FIGURE 29:  

Termination Configuration - 2 Pipe

12” Min.

12” Min.

Maintain 12” minimum clearance
above highest anticipated snow level.
Maximum 24” above roof.

Maintain 12” minimum
clearance above
highest anticipated
snow level.

12” vertical separation
between combustion air
intake and vent.

12” minimum
below overhang

12” minimum
separation between
bottom of
combustion air pipe
and bottom of vent.

Maintain 12”
minimum clearance
above highest
anticipated snow
level or grade,
whichever is higher.

 FIGURE 30:  

Termination Configuration - 2 Pipe Basement

 FIGURE 31:  

Double Horizontal Combustion Air Intake and Vent 

Termination

 FIGURE 32:  

Double Vertical Combustion Air Intake and Vent 

Termination

12” MIN.

12” MIN.

OVERHANG

12” Minimum
below overhang

12” Minimum
separation between
bottom of
combustion air
intake and
bottom of vent

Maintain 12”
minimumclearance
above highest
anticipated snow
level or grade,
whichever is higher

VENT

2”
MIN.

COMBUSTION AIR

MIN.
6”

Summary of Contents for TM9X*MP

Page 1: ...Double Vertical Combustion Air Intake and Vent Termination 24 Downward Venting 25 Direct Vent Air Intake Connection and Vent Connection 25 Combustion Airflow Path Through The Furnace Casing 25 Outsid...

Page 2: ...ition input rate temperature rise and venting according to the manufacturer s instructions 10 When installed in a non HUD Approved Modular Home or building constructed on site combustion air shall not...

Page 3: ...urisdiction In the United States and Canada follow all codes and standards for the following using the latest edition available STEP 1 Safety US National Fuel Gas Code NFGC NFPA 54 ANSI Z223 1 and the...

Page 4: ...n FOR FURNACES INSTALLED IN THE COMMON WEALTH OF MASSACHUSETTS ONLY For all side wall horizontally vented gas fueled equipment installed in every dwelling building or structure used in whole or in par...

Page 5: ...access cover shall be attached in such a manner as to prevent leaks DUCT FLANGES Four flanges are provided to attach ductwork to the furnace These flanges are rotated down for shipment In order to use...

Page 6: ...ould always be installed on the side desig nated as top side See Figure 4 5 FURNACE ASSEMBLY PC SERIES COILS These upflow coils are designed for installation on top of upflow fur naces only If the coi...

Page 7: ...nace is to be installed on a flat solid surface this bottom panel will provide an adequate seal to prevent air leakage through the unused bottom opening However if the furnace is to be installed on a...

Page 8: ...e one support located approximately in the center of the furnace near the blower shelf and the third support should be at the return end of the fur nace Maintain a 6 15 2 cm minimum clearance between...

Page 9: ...densate Drain Optional Return Air Cutout Either side 29 5 For Cladded door add appoximately an additional 75 C SUPPLY END 56 56 20 B 3 23 8 56 Combustion Air Inlet Vent Outlet RETURN END B 24 25 Table...

Page 10: ...the instructions in this section specify the type of gas approved for this furnace only use those approved gases The instal lation of a drip leg and ground union is required Refer to Figure 16 FIGURE...

Page 11: ...opera tion and or the valve to leak Table 5 Nominal Manifold Pressure High Fire Manifold Pressures in w c Manifold Pressures kPa Altitude feet Altitude m 0 7999 8000 8999 9000 9999 0 2437 2438 2742 2...

Page 12: ...ONS Install the field supplied thermostat by following the instructions that come with the thermostat With the thermostat set in the OFF position and the main electrical source disconnected connect th...

Page 13: ...oner Single Stage Furnace HM1 Humidistat Y Full Stage Compressor G Fan PP11C70224 THERMOSTAT RH 24 Volt Hot Heat XFMR RC 24 Volt Hot Cool XFMR W Full Stage Heat Clipping Jumper W914 for electric heat...

Page 14: ...E B E ZD E R OD MODELS HGD HP RHS O Reversing Valve Energized in Cool C 24 Volt Common R 24 Volt Hot W1 66 out Heat Y Compressor DEMAND DEFROST CONTROL X L Malfunction Light W Auxiliary Heat SINGLE ST...

Page 15: ...ier drains are combined with the furnace drain then the open stand pipe could be raised higher above the 5 minimum The Figures 22 25 show the condensate drain arrangement for the various possible furn...

Page 16: ...ed to temperatures below freezing adequate measures must be taken to prevent the drain line from freezing Failure to provide proper protection from freezing can result in improper operation or damage...

Page 17: ...so that no sagging loops will collect and hold condensate which will cause the furnace to not operate Shorten pressure switch hose Re route and shorten pressure switch hose Shorten rain gutter hose M...

Page 18: ...itch hose to this position NOTE May require the longer hose that is provided with wider cabinets Move condensate drain hose to this position May exit either side of the cabinet Move rain gutter hose t...

Page 19: ...ose to this position NOTE May require the longer hose that is provided with wider cabinets Change condensate drain connection to the 90 fitting provided Move condensate drain hose to this position Mov...

Page 20: ...tting provided Move condensate drain hose to this position Move rain gutter hose to this position Change condensate drain connection to the 90 fitting provided Move condensate drain hose to this posit...

Page 21: ...where ABS pipe is joined to PVC pipe must be glued with cement that is approved for use with BOTH materials Metallic materials must not be used for venting or air intake 5 If a flexible connector is u...

Page 22: ...OMBUSTION AIR VENTING FIGURE 26 Dimensions TABLE 8 Elbow Dimensions Elbow A Dimension 2 Standard 2 5 16 3 Standard 3 1 16 2 Sweep 3 1 4 3 Sweep 4 1 16 TABLE 9 Equivalent Length of Fittings Fitting Equ...

Page 23: ...equirements of the gas supplier 12 30 5 cm or in accordance with local installation codes and the requirements of the gas supplier F Clearance to outside corner 12 30 5 cm or in accordance with local...

Page 24: ...rom inside the building The vent for a single pipe system must be installed as specified in the venting section of these instructions with the vent terminating as shown in Figure 28 Each furnace must...

Page 25: ...eric zone Refer to Figure 36 for attic and crawl space termination Only the combustion air intake may terminate in the attic The vent must terminate outside Outdoor Combustion Air Combustion Air Intak...

Page 26: ...on This type of installation requires that the supply air to the appliance s be of a sufficient amount to support all of the appliance s in the area Operation of a mechanical exhaust such as an exhaus...

Page 27: ...m2 per 0 879 kW of the total input rating of all equipment located in the enclosure b Not less than the sum of all vent connectors in the confined space 3 The duct shall be least the same cross sectio...

Page 28: ...RN ON any exhaust fans such as range hoods and bathroom exhausts so they shall operate at maximum speed Open the fireplace dampers Do not operate a summer exhaust fan 4 Follow the lighting instruction...

Page 29: ...eter 1 Turn off all other gas appliances and pilots 2 Run furnace for a minimum of 3 minutes in heating operation 3 Measure time in sec for gas meter to complete 1 revolution and note reading The 2 cu...

Page 30: ...300 750 78 46 92 231 25 144 288 720 80 45 90 225 26 138 277 692 82 44 88 220 27 133 267 667 84 43 86 214 28 129 257 643 86 42 84 209 29 124 248 621 88 41 82 205 30 120 240 600 90 40 80 200 31 116 232...

Page 31: ...essure by adjusting gas valve regulator screw for the appropriate gas per the following 4 After the manifold pressure has been adjusted re calculate the fur nace input to make sure you have not exceed...

Page 32: ...ings 60 90 120 and 180 seconds The fan off delay is factory set to 120 sec onds The fan off setting must be long enough to adequately cool the furnace but not so long that cold air is blown into the h...

Page 33: ...1203 1182 1150 1125 1095 1064 1031 980 Medium 1076 1059 1029 1007 973 946 908 883 843 800 Medium Low 988 967 936 903 875 838 806 765 737 685 Low 798 769 727 695 650 619 574 517 485 443 TM9X080B12MP11...

Page 34: ...off and a retry operation begins Also if the flame is lost for 2 seconds during the 10 second stabilization period the gas valve is shut off and a retry operation begins During a retry operation the...

Page 35: ...rmer wires Both heating and cooling operations will be affected Check polarity at furnace and branch Check furnace grounding Check that flame probe is not shorted to chassis The furnace will not start...

Page 36: ...ING FERRULE 3 req d GASKET FOAM Door 1 5 ft req d GROMMET 3 req d HARNESS WIRING HOSE CONDENSATE HOSE RAIN GUTTER KNOB QUARTER TURN 4 req d MOTOR MOUNT ORIFICE BURNER Natural 45 PAN CONDENSATE PLUG SE...

Page 37: ...r motor speed connections shown are typical but may vary by model and application LEGENDE DS Commutateur de porte MOT Moteur soufflerie TST Thermostat ROS Commutateur de roulement IDM D induct moteur...

Page 38: ...ge without notice Published in U S A 697936 UIM B 01211 Copyright 2011 by Johnson Controls Inc All rights reserved Supersedes 697936 UIM A 0711 Johnson Controls Unitary Products 5005 York Drive Norman...

Reviews: