johNSoN coNtroLS
12
ForM 102.20-N1 (1109)
Fig. 2-28 – inStAlling BOltS AFtER Pulling unitS tight tOgEthER ..................................2-20
Fig. 2-29 – tiEREd unit ........................................................................................................................2-21
Fig. 2-30 – tiEREd unit SECuREd With BRACKEtS ......................................................................2-21
Fig. 2-31 – APPlY gASKEtS tO tOP PAnEl BOttOM tiER ............................................................2-21
Fig. 2-32 – guiding BRACKEtS tOgEthER......................................................................................2-22
Fig. 2-33 – ASSEMBlY OF End ChAnnEl ShiPPing SPlit .............................................................2-23
Fig. 2-34 – hOOd inStAllAtiOn With OPtiOnAl MiSt EliMinAtORS ........................................2-24
Fig. 2-35 – diRECt COuPlEd On JACKShAFt ..................................................................................2-25
Fig. 2-36 – MZ dAMPER/ACtuAtOR ASSEMBlY ................................................................................2-26
Fig. 2-37 –
DAMPER SHAFT EXTENSION KIT
......................................................................................2-27
Fig. 2-38 – V-MOd inStAllAtiOn ........................................................................................................2-28
Fig. 2-39 – V-RAY inStAllAtiOn .........................................................................................................2-28
Fig. 2-40 –
V-FLEX INSTALLATION
.......................................................................................................2-28
Fig. 2-41 – inStAll gASKEt undER ROOF OVERhAng .................................................................2-30
Fig. 2-42 – APPlY gASKEt tO PiPE ChASE .......................................................................................2-31
Fig. 2-43 – PiPE ChASE BASERAil tO unit BASERAil inStAllAtiOn .......................................2-31
Fig. 2-44 – SCREW PiPE ChASE tOP And BOttOM intERnAl FlAngES tO AiR hAndlER ..... 2-31
Fig. 2-45 – BASERAil CAulK APPliCAtiOn ..........................................................................................2-32
Fig. 2-46 – PiPE ChASE tO ROOF inStAllAtiOn .............................................................................2-32
Fig. 2-47 – PiPE ChASE tO AiR hAndlER CAulK APPliCAtiOn ...................................................... 2-32
Fig. 2-48 – inStAll COVER AnglE .....................................................................................................2-32
Fig. 2-49 – PROPER POSitiOning OF COVER AnglE With nOtCh On AiR hAndlER SidE ...... 2-33
Fig. 2-50 – PROPER PAttERn FOR inStAlling SElF-dRilling SCREWS tO
COVER AnglE .....................................................................................................................2-33
Fig. 2-51 – BASERAil COVER APPliCAtiOn ......................................................................................2-33
Fig. 2-52 – gAS FuRnACE FuEl VEnting SYStEM .........................................................................2-34
Fig. 2-53 – gAS FuRnACE COndEnSAtE dRAin tRAP ...................................................................2-35
Fig. 2-54 – tYPiCAl MOtOR dAtA / nAMEPlAtE ..............................................................................2-37
Fig. 2-55 – tYPiCAl POWER WiRing OF EnERgY RECOVERY WhEEl .........................................2-37
Fig. 2-56 – gAS BuRnER COMPOnEnt lOCAtiOnS ........................................................................2-38
Fig. 2-57 – MAin POWER And COntROl PAnEl W/ COVER OPEn ................................................2-38
Fig. 2-58 – tYPiCAl ElECtRiC hEAt COntROl PAnEl intERiOR WiRing And
COMPOnEntS .....................................................................................................................2-39
Fig. 2-59 – tYPiCAl FiEld COntROl And POWER COnnECtiOnS ...............................................2-39
Fig. 2-60 – PRESSuRE PROBE diRECtiOn ........................................................................................2-41
Fig. 2-61 – AiRFlOW SWitCh COnnECtiOnS ...................................................................................2-41
Fig. 2-62 – tYPiCAl huMidiFiER PAnEl lAYOut .............................................................................2-43
Fig. 2-63 – SuPPlY POWER KnOCKOutS ..........................................................................................2-43
Fig. 2-64 – huMidiFiER POintS ...........................................................................................................2-43
Fig. 2-65 – PiPE ChASE EnClOSuRE ................................................................................................2-44
Fig. 2-66 – FACtORY COil COnnECtiOnS .........................................................................................2-44
Fig. 2-67 – StAggEREd COil COnFiguRAtiOnS .............................................................................2-45
Fig. 2-68 – ChillEd WAtER COil COnnECtiOnS ............................................................................2-46
Fig. 2-69 – hOt WAtER PiPing - 2 WAY VAlVE ..................................................................................2-47
liSt OF FiguRES (COnt'd)
Summary of Contents for YORK SOLUTION LD09624
Page 4: ...johnson controls 4 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 10: ...johnson controls 10 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 16: ...johnson controls 16 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 30: ...johnson controls 1 8 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 106: ...johnson controls 2 76 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...