johNSoN coNtroLS
3-26
ForM 102.20-N1 (1109)
Startup
Fig. 3-26 – PRESSuRE PROBE diRECtiOn
Fig. 3-27 – AiRFlOW SWitCh COnnECtiOnS
TOP VIEW OF UNIT
POSITIVE PRESSURE / AIR BLOWN THROUGH HEATER
NEGATIVE PRESSURE / AIR DRAWN THROUGH HEATER
BLOWER
BLOWER
HEATER
HEATER
AIRFLOW
PICK UP TUBE TOWARDS BLOWER
ATTACHED TO “HIGH” PORT OF AIRFLOW SWITCH
PICK UP TUBE TOWARDS BLOWER
ATTACHED TO “LOW” PORT OF AIRFLOW SWITCH
AIRFLOW
C
NO
NC
HIGH PORT
LOW PORT
MOUNTING
BRACKET
LD14268
LD14270
Summary of Contents for YORK SOLUTION LD09624
Page 4: ...johnson controls 4 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 10: ...johnson controls 10 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 16: ...johnson controls 16 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 30: ...johnson controls 1 8 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 106: ...johnson controls 2 76 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...