johNSoN coNtroLS
2-18
ForM 102.20-N1 (1109)
installation
Fig. 2-24 – REMOVE And REPOSitiOn ShiPPing
SPlit AnglE
SECURE TOGETHER USING 3/8" X 3/4"
BOLT, LOCK WASHER & HEX NUT.
REMOVE SHIPPING
BRACKETS
HEAT WHEEL (ER) SEGMENT
END SPLIT MOUNTING BRACKET
FIG. 2-23 – ASSEMBLY OF END CHANNEL SHIPPING SPLIT (EXPANDED CABINET)
LD14262
2. Place the first section in its final position and
anchor or block it before placing the next section
(
see Fig. 2-25).
After wiring connections are made
and before proceeding with assembly,
the top shipping split angle will need
to be removed and repositioned (see
Fig. 2-24).
Remove Shipping Split Angle
after completion of wiring and
tubing placement and
reposition before proceeding
with assembly of shipping
splits.
Remove Shipping Split Angle
after completion of wiring and
tubing placement and
reposition before proceeding
with assembly of shipping
splits.
LD14097
Summary of Contents for YORK SOLUTION LD09624
Page 4: ...johnson controls 4 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 10: ...johnson controls 10 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 16: ...johnson controls 16 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 30: ...johnson controls 1 8 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 106: ...johnson controls 2 76 FORM 102 20 N1 1109 THIS PAGE INTENTIONALLY LEFT BLANK ...