P5417009-rev.6
43
4
Diameter of Pipe after First Branch *
6
Total Indoor Unit
Capacity
(MBH)
Low Pressure Gas
High/Low Pressure
Gas
Liquid
< 47
5/8 (15.88)
1/2 (12.7)
3/8 (9.52)
48 - 71
3/4 (19.05)
5/8 (15.88)
3/8 (9.52)
72 - 95
7/8 (22.2)
3/4 (19.05)
3/8 (9.52)
96 - 119
7/8 (22.2)
3/4 (19.05)
1/2 (12.7)
120 - 143
1-1/8 (28.58)
7/8 (22.2)
1/2 (12.7)
144 - 215
1-1/8 (28.58)
7/8 (22.2)
5/8 (15.88)
216 - 299
1-3/8 (34.93)
1-1/8 (28.58)
3/4 (19.05)
> 300
1-5/8 (41.28)
1-3/8 (34.93)
3/4 (19.05)
*6 If the size of
4
“Diameter of Pipe after First Branch” is larger than the size of
3
“Main Pipe Diameter”, adjust the
size of
4
“Diameter of Pipe after First Branch” to the same size as
3
“Main Pipe Diameter”.
3
Main Pipe Diameter
(Base Unit or Piping Connection Kit 1 to First Branch)
Model: (H,Y)VAHR_B(3,4)2S
Outdoor Unit
Capacity
(MBH)
Low Pressure Gas
High/Low Pressure
Gas
Liquid
Maximum Equivalent Piping Length
< 328 ft (100m)
> 328 ft (100m) *
5
72, 96
7/8 (22.2)
3/4 (19.05)
1/2 (12.7)
5/8 (15.88)
120
1-1/8 (28.58)
7/8 (22.2)
1/2 (12.7)
5/8 (15.88)
144 - 192
1-1/8 (28.58)
7/8 (22.2)
5/8 (15.88)
3/4 (19.05)
216
1-1/8 (28.58)
7/8 (22.2)
3/4 (19.05)
3/4 (19.05)
240, 264
1-3/8 (34.93)
1-1/8 (28.58)
3/4 (19.05)
3/4 (19.05)
288 - 360
1-3/8 (34.93)
1-1/8 (28.58)
3/4 (19.05)
7/8 (22.2)
384 - 432
1-5/8 (41.28)
1-3/8 (34.93)
3/4 (19.05)
7/8 (22.2)
*5 In some cases, it is required to prepare the reducer (field-supplied).
Piping Size Unit: inch (mm)
Refer to the figure at the beginning of section 6.5.
inch (mm)
inch (mm)