4.5 FRON
1) Remove
2) Remove
3) Remove
4) Replace
the spe
5) Check b
NT ROLLE
the motor co
both of the r
Fig-
e the drive b
e new Front
cification is <
belt tension w
Fig
CH
ER REPLA
over as outlin
rear roller scr
-1
elt from the f
roller and mo
<1.5mm.
with equipme
g-4
HAPTER 4
CEMENT
ned in Sectio
rews to remo
front roller an
otor drive be
ent (Fig-4)
4: Part Re
on 4.1.
ove tension f
nd remove th
elt. and check
Specification
Belt tension
eplacemen
from the runn
Fig-2
he roller from
k belt alignm
n
:
275~3
nt Guide
ning belt.(Fig
2
m the running
ent with alig
30Hz
g-1).
g belt.(Fig-2)
nment Jig, (F
28
Fig-3
Fig-3)
8
Summary of Contents for AFG Pro 7.2AT
Page 2: ...Prod duct Br rowse 2 2...
Page 5: ...1 1 Serial SERIAL N l Number NUMBER CHAP Location PTER 1 S Serial Number Locatio on 5 5...
Page 9: ...CONSOLE E ELECTRIC CAL DIAGR CHAPTER RAM R 3 Troubleshooting 9 9...
Page 12: ...3 2 2 Engineering Mo ode CHAPTER R3 Troub bleshooting g 12 2...
Page 13: ...13 3...