Console Diagnostics Mode
(JPC/B/S/E)
STEP 1
STEP 2
STEP 3
STEP 4
1.
Sit
(stand)
on your bike
(stepper
), Press and hold
down the "RESET” key then
(for stepper turn
the power on)
start pedaling to reach a pedal
speed of approximately 30rpm.
OR
Press and
hold down the "RESET” key then plug the
adapter (JPE).
2.
Dot Matrix Display will be scanned slowly starting
from LEDs of the bottom row to the top; each
segment of the 7-segments will be scanned
simultaneously
u
If one of LEDS is not lit, replace the PCB.
1.
Press the ENTER key.
2.
Dot Matrix Display will be scanned slowly starting
from LEDs at the leftmost column to the right.
3.
Each 7-segments display will be scanned one by
one.
u
If one of LEDS is not lit, replace the PCB.
1.
Press the ENTER key.
2.
Dot Matrix and 7-segments will display lighted up
u
If one of LEDS is not lit, replace the PCB.
1.
Press the ENTER key.
2.
Dot Matrix Display will show “RPM”.
3.
“RPM” window will show current RPM
4.
“TIME” window will show total accumulated
minutes and seconds.
5.
“AGE” window will show total accumulated hour.
6.
Hold down the ”RESET” key first then press
“PAUSE” key to clear the record.
u
If RPM is not shown, please refer to section 4-2 for
troubleshooting.
2-11 Revision: 1.0 Date: 2001/06/01
Summary of Contents for JAR-5100
Page 1: ...o JPB 5100 o JPS 5100 o JAR 6000 o JPC 5100 o JPE 5100 o JAR 5100 ...
Page 5: ...SECTION 1 WIRING DIAGRAM Revision 1 0 Date 2001 06 01 ...
Page 11: ...JPC B 5100 WIRING DIAGRAM 1 6 Revision 1 0 Date 2001 06 01 ...
Page 12: ...JPS 5100 WIRING DIAGRAM 1 7 Revision 1 0 Date 2001 06 01 ...
Page 13: ...JAR 5100 WIRING DIAGRAM 1 8 Revision 1 0 Date 2001 06 01 ...
Page 14: ...JPE 5100 WIRING DIAGRAM 1 9 Revision 1 0 Date 2001 06 01 ...
Page 35: ...SECTION 3 PARTS REPLACEMENT PROCEDURE Revision 1 0 Date 2001 06 01 ...
Page 72: ...SECTION 4 PREMENTIVE MAINTENANCE Revision 1 0 Date 2001 06 01 ...
Page 76: ...SECTION 5 SERVICE FORM Revision 1 0 Date 2001 06 01 ...