31
CHAPTER 4: Part Replacement Guide
4.8 LINK ARM REPLACEMENT
1. Remove the pedal arm (see section4.5)
2. Remove the plastic cover (Figure A), then remove the link arm bolt (Figure B).
3. Remove the bolt which fix the link arm and connected tube.(Figure C&D) Then remove the link arm.
Notes: torque for the link arm bolt is 800kgf.cm.
Figure C&D
4.
Reverse steps to replace link arm.
Summary of Contents for Matrix Retail A30
Page 5: ...5 CHAPTER 1 Serial Number Location ...
Page 6: ...6 CHAPTER 1 Serial Number Location ...
Page 7: ...7 CHAPTER 1 Serial Number Location ...
Page 8: ...8 CHAPTER 2 Console Browse Please refer to XR XER XIR service manual to get more details ...
Page 9: ...9 CHAPTER 3 Troubleshooting 3 1 ELECTRICAL DIAGRAM A30 ...
Page 10: ...10 CHAPTER 3 Troubleshooting 3 1 ELECTRICAL DIAGRAM A50 ...
Page 11: ...11 CHAPTER 3 Troubleshooting 3 1 ELECTRICAL DIAGRAM A30 50 Connection Console Connection ...