INSTALLATION
Installation must be carried out by a licensed plumber in compliance with the Plumbing Code of Australia..
Check local and national building regulations before installation to ensure the below methods comply with
the relevant codes.
Tools required for installation: Silicone Gun, Spirit Level, Tape Measure, Pencil, Adjustable Spanner.
1. Inspect bath thoroughly before installation. Claims for defects and/or damage must be made before
installation commences.
2. Place bath in intended position and mark out position on the finished floor.
3. Check level by placing spirit level across the width and length of bath, then adjust feet to suit.
Ensure the bath is fully supported on all feet.
4. Connect waste to drainage using approved methods [Fig. 1 or Fig. 2].
5. Apply silicone to underside of feet to secure to place.
6. Conduct final water test on bath to ensure water drains to waste.
7. Allow silicone 24 hours (minimum) curing time.
Note: Hot water applied to this product must not exceed 55
o
C.
Floor Waste and trap are not included.
Plug & Waste
Plug & Waste Extension
Smart Waste rubber seal
Smart Waste
o
100 mm 90 Elbow
Figure 1
INSTALLATION GUIDE
Villaboard or
water resistant
wall lining
Sealant
Tiles or wall
sheeting
Wall
Structure
Figure 2
Colonial
Clawfoof Freestanding Bath
JBTC2152