background image

INSTALLATION 
Installation must be carried out by a licensed plumber in compliance with the Plumbing Code of Australia..

Check local and national building regulations before installation to ensure the below methods comply with

  the relevant codes.

Tools required for installation:  Silicone Gun, Spirit Level, Tape Measure, Pencil, Adjustable Spanner.

1.  Inspect bath thoroughly before installation. Claims for defects and/or damage must be made before 

  installation commences.

2.  Place bath in intended position and mark out position on the finished floor.

3.  Check  level  by  placing  spirit  level  across  the  width  and  length  of  bath,  then  adjust  feet  to  suit. 

   Ensure  the  bath  is  fully supported on all feet.

4.  Connect waste to drainage using approved methods [Fig. 1 or Fig. 2].

5.  Apply silicone to underside of feet to secure to place.

6.  Conduct final water test on bath to ensure water drains to waste.

7.  Allow silicone 24 hours (minimum) curing time.

Note: Hot water applied to this product must not exceed 55

o

 C. 

Floor Waste and trap are not included.

Plug & Waste

Plug & Waste Extension

Smart Waste rubber seal

Smart Waste

o

100 mm 90 Elbow

Figure 1

INSTALLATION GUIDE

Villaboard or

water resistant

wall lining

Sealant

Tiles or wall

sheeting

Wall

Structure

Figure 2

Colonial

Clawfoof Freestanding Bath

JBTC2152

Reviews: