5.8  Fuse

         The fuse should be connected to each 
non-grounded pole of the array (in other 
words, if system is not grounded, the fuse 
should be connected to both positive and 
negative terminals).

         b) The fuse rating also corresponds 
to the maximum reverse current that the 
module could withstand (when an array is 
shading, the array is loaded into another 
parallel module array to generate power), 
thus the number of parallel connected 
arrays is affected.

         c) It is forbidden to connect two or 
more strings in parallel and then share 
the fuses.

         a) The maximum rating of the fuse 
connected in series is 30A, and the module
- s p e c i fi c   ra t i n g s   a r e   a va i l a b l e   o n   t h e  
product label and product data sheet.

5.7  Wiring

         In order to ensure PV system could 
operation smoothly, when connecting modules 
or connecting loads (such as inverters batteries, 
etc.), ensure that the polarity of the cables is 
properly connected (Figure 1 and Figure 2). 
If modules are not connected properly, the 
bypass diode may be damaged. Modules 
could be connected in series to increase 
voltage. Connecting modules in series by 
inserting the positive terminal of one module 
into the negative terminal of the next module. 
Figure 1 shows the serial connection of 
modules. Modules could be connected in 
parallel to increase current (shown in Figure 2). 
Connecting modules in series in Parallel by 
inserting the positive terminal of one module 
into the negative terminal of the next module. 
The number of modules connected in series 
or in parallel needs to be reasonably designed 
according to the system configuration. All 
instructions above must be followed to meet 
the Jolywood Warranty valid conditions.

13

Jolywood (Taizhou) Solar Technology Co.,Ltd.

Kaiyang Rd., Jiangyan Economic Development zone, Taizhou City, Jiangsu Province, P. R. China

www.jolywood.cn

 mkt@jolywood.cn

 +86-523-8061 2361

Installation Manual

 - Jolywood N-type Mono-crystalline Double Glass Module

Summary of Contents for JW-HD108N

Page 1: ...INSTALLATION MANUAL Jolywood N type Mono crystalline Double Glass Module M10 Double glass module HD108N P All rights reserved Jolywood Taizhou Solar Technology Co Ltd...

Page 2: ...Installation Safety Mechanical installation and precautions Framed Bifacial Double Glass Modules installation with clamps Grounding Electrical installation Wiring Fuse Maintenance for PV Modules Modu...

Page 3: ...must be installed and maintained by quali ed person with professional knowledge Before installing wiring operating or maintaining modules you should read and understand all safety rules Modules will g...

Page 4: ...odules from be damaged please avoid scratching cutting the cables and connectors or exposed under the sun for a long time Do not drop module or drop other things onto the module surface Do not place a...

Page 5: ...le and ensure that the glass surface is facing down on a soft surface preventing water from entering inside of the module preventing connectors from be damaged Unpacking must be operated by two or mor...

Page 6: ...aged with original package could be transported by land sea or air During transportation xing the package to the transport platform to ensure it would not be tumbled Taking land transportation as an e...

Page 7: ...ng the corner of the module the other hand grasping the short side of the module When unpacking on a horizontal oor remove modules from one side to the other side of package and then carry them If unp...

Page 8: ...ic shock may be caused Modules should be installed immediately after unpacked 5 1 4 Do not wear metal rings wristwatches earrings nose rings lip rings or other metal materials when installing or repai...

Page 9: ...s y ste m d e s i g n e r b a s e d o n a c t u a l c o n d i t i o n s a n d en v i r o n m e n t a l M o r e o v e r i t d o e s n o t withstand the excessive force generated by the thermal expansi...

Page 10: ...d front 1200pa back 1200pa Mounted with 4 clamps along the short frame A 250mm 30mm C shaped steel parallel to the long frame Clamp height 30mm width 40 50mm Maximum load front 4800pa back 1200pa Moun...

Page 11: ...M8 A2 70 a stainless steel SUS304 at washer with an outer diameter of 20 2 mm and a thickness of 1 1 1 2 mm the corresponding stainless steel spring washer thickness is 2 0 0 2mm Bolt 11 Jolywood Tai...

Page 12: ...p e r ca b l e w i t h a c ro s s sectional area of 4mm2 system voltage 1500V DC insulation layer maximum work temperature up to 90 C also UV resistant All cables used to connect the DC system m u s...

Page 13: ...oads such as inverters batteries etc ensure that the polarity of the cables is properly connected Figure 1 and Figure 2 If modules are not connected properly the bypass diode may be damaged Modules co...

Page 14: ...ypass diodes to minimize module heating and current loss 6 1 2 Check if the installed hardware is securely in place 6 1 3 Check if all array fuses in each of the non grounded poles are working properl...

Page 15: ...essure on the surface of module glass shall not exceed 700 kPa 14619 80 lb ft2 and the module is not allowed to withstand additional external force such as oil on the surface of modules use a non fric...

Page 16: ...t http www jolywood cn Our technical service representatives will contact you within 5 working days The required username and password will be sent via the Customer Service link Please download the sp...

Reviews: