6.2    Connector and Cable Inspection

6.2.1

         Check if all cables are securely connected.
 It is suggested that all cables shouldrunin 
proper cable ducts and should be located 
away from the water-prone area.

6.2.2

         Check the electrical, grounding, and 
mechanical connections every 6 months to 
ensure that they are clean, safe, free from 
damage, and rust-free; ensure that the 
mountings properly tightened; check all 
cables to make sure they are tight.

6.2.3

         It is forbidden to use WD-40 or various 
organic solvents to wipe all parts of the
junction boxes, wires, and connectors.

6.1.1

         Maintenance should be carried out at 
least once a year by trained person. A s 
system voltage is so high, that maintenance 
person should always wear rubber gloves 
and insulated boots. Removing all possible 
shading of the solar array, which would affect
power generation of the module array.

6.1.5

        Cover the front surface of Modules with an 
opaque material. Modules exposed under the sun 
could be extremely dangerous, as high voltages 
could be generated.

6.1.6

       Module junction boxes is equipped with bypass 
diodes to minimize module heating and current loss

6.1.2

         Check if the installed hardware is securely 
in place.

6.1.3

         Check if all array fuses in each of the 
non-grounded poles are working properly.

6.1.4

         If module is damaged (glass breakage 
or scratches on the back glass), it is need 

to be replaced. Module must be  replaced 
with same type one. Do not touch the live 
parts of the cables or connectors when 
replacing modules. Use appropriate safety 
guards (insulation tools, insulated gloves, 
insulated boots, etc.) when handling modules.

         Modules in array should be regularly 
inspected to check damage modules. If 
damage module is founded, it must be 
replaced with same type one. Such as broken 
glass, broken cables, damaged junction box, 
etc., which would lead to functional and safety 
failure of modules.

         Well-designed solar systems require 
minimal maintenance, and some simple steps 
could be taken to improve system performance 
and reliability.

6.0    Maintenance for PV Modules

6.1    Module Visual Inspection and 

         Replacement

14

Jolywood (Taizhou) Solar Technology Co.,Ltd.

Kaiyang Rd., Jiangyan Economic Development zone, Taizhou City, Jiangsu Province, P. R. China

www.jolywood.cn

 mkt@jolywood.cn

 +86-523-8061 2361

Installation Manual

 - Jolywood N-type Mono-crystalline Double Glass Module

Summary of Contents for JW-HD108N

Page 1: ...INSTALLATION MANUAL Jolywood N type Mono crystalline Double Glass Module M10 Double glass module HD108N P All rights reserved Jolywood Taizhou Solar Technology Co Ltd...

Page 2: ...Installation Safety Mechanical installation and precautions Framed Bifacial Double Glass Modules installation with clamps Grounding Electrical installation Wiring Fuse Maintenance for PV Modules Modu...

Page 3: ...must be installed and maintained by quali ed person with professional knowledge Before installing wiring operating or maintaining modules you should read and understand all safety rules Modules will g...

Page 4: ...odules from be damaged please avoid scratching cutting the cables and connectors or exposed under the sun for a long time Do not drop module or drop other things onto the module surface Do not place a...

Page 5: ...le and ensure that the glass surface is facing down on a soft surface preventing water from entering inside of the module preventing connectors from be damaged Unpacking must be operated by two or mor...

Page 6: ...aged with original package could be transported by land sea or air During transportation xing the package to the transport platform to ensure it would not be tumbled Taking land transportation as an e...

Page 7: ...ng the corner of the module the other hand grasping the short side of the module When unpacking on a horizontal oor remove modules from one side to the other side of package and then carry them If unp...

Page 8: ...ic shock may be caused Modules should be installed immediately after unpacked 5 1 4 Do not wear metal rings wristwatches earrings nose rings lip rings or other metal materials when installing or repai...

Page 9: ...s y ste m d e s i g n e r b a s e d o n a c t u a l c o n d i t i o n s a n d en v i r o n m e n t a l M o r e o v e r i t d o e s n o t withstand the excessive force generated by the thermal expansi...

Page 10: ...d front 1200pa back 1200pa Mounted with 4 clamps along the short frame A 250mm 30mm C shaped steel parallel to the long frame Clamp height 30mm width 40 50mm Maximum load front 4800pa back 1200pa Moun...

Page 11: ...M8 A2 70 a stainless steel SUS304 at washer with an outer diameter of 20 2 mm and a thickness of 1 1 1 2 mm the corresponding stainless steel spring washer thickness is 2 0 0 2mm Bolt 11 Jolywood Tai...

Page 12: ...p e r ca b l e w i t h a c ro s s sectional area of 4mm2 system voltage 1500V DC insulation layer maximum work temperature up to 90 C also UV resistant All cables used to connect the DC system m u s...

Page 13: ...oads such as inverters batteries etc ensure that the polarity of the cables is properly connected Figure 1 and Figure 2 If modules are not connected properly the bypass diode may be damaged Modules co...

Page 14: ...ypass diodes to minimize module heating and current loss 6 1 2 Check if the installed hardware is securely in place 6 1 3 Check if all array fuses in each of the non grounded poles are working properl...

Page 15: ...essure on the surface of module glass shall not exceed 700 kPa 14619 80 lb ft2 and the module is not allowed to withstand additional external force such as oil on the surface of modules use a non fric...

Page 16: ...t http www jolywood cn Our technical service representatives will contact you within 5 working days The required username and password will be sent via the Customer Service link Please download the sp...

Reviews: