3
139467_03 GF 370 DV II June 2015
Table of Contents
Installation & Service Tools ..................2
Specifications .................................................. 4
General Information .......................................5
Safety Information ........................................6
Installation
Hearth Requirements .........................7
Clearances ...............................................7
Vent Requirements
Approved Vent Manufacturers ......... 8
Vertical Termination ............................ 8
Masonry Chimney Conversion ..........9
Horizontal Termination .....................10
Vent Termination Clearances ............11
Vent Restriction Adjustments ..........12
Vent Termination Diagram ............... 13
Stove Assembly
1. Glass Frame Removal ..................14
2. Routing the Power Supply .........14
3. Gas Connection ..............................14
4. Gas Pressure ...................................15
5. Fuel Conversion .............................16
6. High Altitude Adjustment ..........18
7. Skamol Panel Installation ...........18
8. Reflective Panel Installation .......18
9. River Rock Installation .................19
10. StarFire Glass Installation ..........19
11. Log Set Installation .....................20
12. Outer Decorative Glass Panels ..21
13. System Check ............................... 22
14. Flame Picture Adjustment ..........23
Operation
System Overview ............................... 24
Control Functions ................................25
Wiring Diagrams ................................28
Maintenance
Annual Cleaning .................................30
Glass Replacement ............................30
Battery Replacement ......................... 31
Accent Lamp Replacement .............. 31
Illustrated Replacement Parts ........... 32 - 35
Appendix
Mobile Home Installation ................36
Correct Optional Flame Pictures ...36
Warranty Statement .....................................37
Lighting Instructions ................................. 39
Unpacking the Stove
1. Before beginning the installation, inspect the
stove for shipping damage
and immediately report
any evidence of damage to your dealer.
2. Confirm stove contents.
The Jøtul GF
370
DV II includes the following loose
items shipped in the Miscellaneous Hardware bag;
• 4 mm hex key -
used to remove the
front glass panel for access to the firebox.
• Remote Control Transmitter
• Remote Control Wall Mount Bracket
• AA Batteries, 4
•
Propane Fuel Conversion Kit 156800
• Vent Collar Grate Inserts
3. Remove the Top Plate.
Remove and discard
the3three shipping spacers from the top plate
supports. Replace the Top Plate. See fig. 66, page 38.
4. Detach the Rear Seam Molding from shipping pallet.
Bend the upper and lower tabs to engage the
molding over the rear seam of the stove body. See
fig. 64, page 34.
5. Confirm Firebox Components.
Some parts and accessories have been packed in
separate boxes, and include one or more of the
following items:
• Traditional Log Set 156789
• StarFire Glass 156815, Clear or 157342, Black
• River Rocks 157428
• Reflective Glass Panels 156817
• Tumbled Stones 157229
6. Remove Pallet Screw.
See fig. 1.
7. Safety Screen Barriers:
Two side safety barriers
and one front barrier are shipped with the stove.
These must be attached over the glass fire-viewing
panels for protection from hot glass. Engage the
safety barrier mounting tabs over the edges of the
cast iron stove panels.
Figure 1.
Pallet screw location