Introduction
Solar hot water systems should be designed and sized correctly before commencing
the installation. Proper design will ensure that a system is correctly sized to provide
many years of optimised performance and most or all of the required hot water when
the most solar radiation is available. However a supplementary heating system such
as oil or gas boiler, heat pump or wood boiler is required for months which have less
solar radiation. This guide will illustrate and explain how a system should be installed
to conform to the Joule manufacturer guidelines for the Vissolis product models. Us-
ing this guide Stages of a solar installation are described in the following pages, with
illustrations where necessary to explain how to install the relevant components, and
contains general recommendations and important safety information.
Handling Guidance
• Tube and manifold boxes should be transported horizontally.
• Heavy goods should not be loaded on top of the kit boxes.
• Care should be taken when opening boxes to prevent scratches or sudden shocks
to the glass.
• Do not use sharp objects to open the tube boxes.
Installation Guidance
• Unpack and install tubes only after the manifold and pipe work has been installed.
• Do not leave the solar collector exposed to solar radiation when the solar loop and
manifold have been drained. Collectors left exposed in a dry state must be cov-
ered to prevent possible long term damage.
• Tubes must have a minimum elevation of 20˚ and a maximum of 70˚.
• The pipework of the solar collector loop is to be earthed and the collector is to be
lightening protected in accordance to local regulations.
A solar panel installation must be performed in accordance with all Health & Safety
legislation and local building/planning regulations for the relevant jurisdiction. Further-
more, the necessary electrical work required to install control equipment should be
undertaken by a qualified electrical contractor.
4
Summary of Contents for Navitas In-roof
Page 1: ...NAVITAS IN ROOF joule navitas solar in roof flat panel installation manual INSTALL...
Page 2: ...Installer Loyalty Scheme Coming Soon 2...
Page 12: ...Overview of materials Single row R1 double multiple row R2 12...
Page 13: ...13 NAVITAS IN ROOF installation manual...
Page 14: ...Overview of materials Single row R1 14...
Page 15: ...15 NAVITAS IN ROOF installation manual...
Page 16: ...Overview of materials Double multiple row R2 16...
Page 17: ...Overview of tools 17 NAVITAS IN ROOF installation manual...
Page 18: ...Mounting Single row R1 18...
Page 19: ...19 NAVITAS IN ROOF installation manual...
Page 20: ...Mounting Single row R1 20...
Page 21: ...21 NAVITAS IN ROOF installation manual...
Page 22: ...Mounting Single row R1 22...
Page 23: ...23 NAVITAS IN ROOF installation manual...
Page 24: ...Mounting Single row R1 24...
Page 25: ...25 NAVITAS IN ROOF installation manual...
Page 26: ...Mounting Single row R1 26...
Page 27: ...27 NAVITAS IN ROOF installation manual...
Page 28: ...Mounting Single row R1 28...
Page 29: ...29 NAVITAS IN ROOF installation manual...
Page 30: ...Mounting Single row R1 30...
Page 31: ...31 NAVITAS IN ROOF installation manual...
Page 32: ...Mounting Single row R1 32...
Page 33: ...33 NAVITAS IN ROOF installation manual...
Page 34: ...In roof installation Double multiple row R2 34...
Page 35: ...35 NAVITAS IN ROOF installation manual...
Page 36: ...In roof installation Double multiple row R2 36...
Page 37: ...37 NAVITAS IN ROOF installation manual...
Page 38: ...In roof installation Double multiple row R2 38...
Page 39: ...39 NAVITAS IN ROOF installation manual...
Page 40: ...In roof installation Double multiple row R2 40...
Page 41: ...41 NAVITAS IN ROOF installation manual...
Page 42: ...In roof installation Double multiple row R2 42...
Page 47: ...47 NAVITAS IN ROOF installation manual...
Page 48: ...48...
Page 49: ...49 NAVITAS IN ROOF installation manual...
Page 50: ...Commissioning 50...
Page 54: ...54...