39
PULSA PV
installation manual
Step 8 – Verification and Commissioning
Prior to final connection to the electricity network, ensure that all AC and DC wiring is
correct.
• Ensure that none of the AC and DC wires are pinched or damaged.
• Ensure that all AC junction boxes are properly closed.
• Ensure that all unused connectors are capped.
• Ensure that all connectors are properly seated.
• Install the Microinverters and commission the system as instructed by the Enphase
Microinverter installation and operation manual and in accordance with all local and
national requirements.
Start Up Sequence
1. Ensure the PV system MCB and the AC isolator are set to ON
2. Wait 3 minutes for the Microinverter system to start up.
3. A flashing green LED light on each Microinverter indicates that the system is op-
erating correctly
Shut Down Sequence
1. Turn OFF the AC isolater between the consumer unit and the PV panels
Summary of Contents for Pulsa PV
Page 1: ...PULSA PV joule pulsa pv solar high performance ac solar module installation guide...
Page 2: ......
Page 4: ......
Page 10: ...Maximising Performance 10 Locating the Unit...
Page 11: ...Transportation and Installation Notes 11 PULSA PV installation manual...
Page 15: ...15 PULSA PV installation manual...
Page 29: ...29 PULSA PV installation manual...
Page 32: ...32 Locating the Unit Electrical Installation Microinverter Technical Specification...
Page 33: ...33 PULSA PV installation manual...
Page 42: ......
Page 43: ......