6
L
6
L
32
29
17
7
L
29
32
17
7
R
7. - Upper swing arm and lower swing arm.
-
Put the left upper swing arm (7L) into the lower swing
arm (6L). And use M8*45 inner hexagon screw (29)
to insert the M8 arc washer (17), upper swing arm,
lower swing arm and the M8 nylon cap. Screw them
tight.
-
NOTE: THE ASSEMBLING WAY OF THE RIGHT
UPPER SWING ARM (7R) IS SAME AS THE LEFT
ARM.
8. –Hand bar and meter.
- Remove the two M8*25 inner hexagon screws (42),
two M8 spring washers (23) and two
OD20*ID8.5*2.0T flat washers (83) which are
pre-assembled on the hand bar (8).
N
M
I
E F G
A
B
4
D
C
83
23
42
30
9
8
- Take the hand bar (8) close to the top of the meter
post. Connect the hand pulse wire port C on the
meter post with the hand pulse wire port A on the
hand bar; connect the wire port D on the meter
post with the wire port B on the hand bar.
- Attach the hand bar (8) onto the top of the meter
post. Use the removed screws and washers to lock
them up.
- Then remove the four M5*12 screws (30) on back of
the meter (9). Put two AA size batteries into the
slot and cover them.
- Take the meter close to the top of the meter post.
Connect the wire port F with wire port I; connect
the wire port E with wire port M; connect the wire
port G with wire port N. Please refer to the photo.
- Finally attach the meter on the meter post and use
the removed screws, spring washers and washers
to lock them up.