4
12
13
33
32
16
31
10
12
11
9
2
1
30
14
7 METER
Remove the meter screws M5*12 (2) from the
back of the meter (1).
Combine the meter connecting upper wire
(53) with meter wire at back of the meter.
Attach the meter (1) on the top site of the
meter post (14) and use the removed meter
screws M5*12 to lock them up.
8 HANDLE BAR & HOUSING.
Put the handle bar (9) into the handle bar fixer.
Cover a handle bar rear housing (10) and use an
M5*16 cross screw (12) to lock it.
Cover the handle bar front housing (13).Adjust
the handle bar at a proper angle so that you can
insert the handle bar knob (33) through handle
bar knob tube bushing (32), M8 spring washer
(16) and OD12*ID8*1.5T (31).. Screw the knob
to fix them all up on the handle bar. Please refer
to the Photo 8-A.
Then use an M5*16 cross screw to fix a the
handle bar front housing. Use an M4*20 cross
screw to fix together with handle bar front
housing (13) and handle bar rear housing (10).
Plug the hand pulse wire (9) into the sensor hole
on back side of the meter.
Photo 8-A
9