4.2.2 Size of embedded hole
305
13
9
Figure 3
4.3 Installation procedures
4.3.1 Preparation work before installation
Please ensure that the sliding gate is correctly installed, the gate rail is horizontal, and the gate can
glide back and forth smoothly when moved by hands before installing the gate opener.
Cable installation
Please bury the motor & power cable and controlling cable with PVC tube, and use two PVC tubes
to bury (motor & power cable) and (controlling cable) separately, so as to guarantee normal
operation of the gate opener and protect the cables from damages.
Concrete pedestal
Please cast a concrete pedestal with the size of 550mm x 400mm and depth of 200mm in advance,
so as to firmly install PY800ACL/PY1400ACL gate opener.
Please verify whether the distance
between the gate and gate opener is suitable before casting the pedestal.
Embedded screws
Concrete
Power line
Mounting base
Foundation bolt