SL600AC SLIDING GATE OPERATOR
4
Gate preparation
Be sure the gate is properly installed and slides smoothly before
installing the SL600AC sliding gate operator. The gate must be plumb,
level, and move freely.
Conduit
In order to protect the cable, use PVC conduit for low voltage power
cable and control wires. Conduit must be preset into the concrete
when it is poured. Wires within the conduit shall be located or
protected so that no damage can result from contact with any rough
or sharp part.
Concrete pad
The base unit of the gate operator requires a concrete pad in order to
maintain proper stability. The concrete pad should be approximately
450mm x 300mm x 200mm deep in order to providing for adequate
weight and structure to insure proper stable installation.
Anchors (see Fig.2)
You can use anchor bolts, anchors, washers and nuts. These
anchors must be set into the concrete when it is poured or you can
use wedge anchors to fasten the operator.
Gate operator
Gear
Groundsill
Input power
Plain washer
Nut
Spring washer
Nut
SL600AC SLIDING GATE OPERATOR
5
Gate operator
Gear
Groundsill
Input power
Plain washer
Nut
Spring washer
Nut
Fig.2
Operator base (see Fig.3)
After the concrete has hardened, mount the gate operator base to the
concrete pad. Verify that the base is properly leveled.
Using bolts and washers mount the gate operator to the base and
insert the cover. Check the operator and make sure it is lined up with
the gate.
Fig.3