5.2.2 Periodic Check Table 2
Check mark
○
: Normal,
△
: Normal after rework or repair
(example filling in)
Date checked
Installation
completed on
'02.06.14
Inspector
service
engineer name
○○○○
Check items
a. Confirm tightness of
fixing screws in
mechanical sections and
connecting screws in the
terminal board.
(Re-tighten if loosened.)
○
b. Confirm connecting and
wire wearing conditions at
connecting wire mounting
points and wire bases
○
c. Confirm operating
conditions of switches,
and displayed state of
LEDs and indicators.
○
d. Confirm that warning
labels and other
indication labels are not
dirty or detached.
Clean if they become
dirty.
○
e. Items to be dealt with,
and item to be informed.
Periodical Check Table (2)
Figure 52: Periodic Check Table 2
79 | Appendices
Summary of Contents for Alpatron AlphaMidiCourse
Page 1: ...AlphaMidiCourse Gyro Compass Installation and Operation Manual www jrc am ...
Page 68: ...5 1 1 Outline Control Unit One Gyro Compass System Figure 41 Control Box 68 Appendices ...
Page 69: ...5 1 2 Operating Panel Figure 42 Operating Panel 69 Appendices ...
Page 70: ...5 1 3 Master Compass Figure 43 Main Unit 70 Appendices ...
Page 71: ...Figure 44 Open Gyro Compass 71 Appendices ...
Page 73: ...5 1 5 Connection Diagram Figure 46 Connection Diagram 73 Appendices ...
Page 74: ...5 1 6 Cable Diagram Figure 47 Cable Diagram 74 Appendices ...
Page 75: ...5 1 7 Installation Drawing Figure 48 Installation Drawing 75 Appendices ...
Page 76: ...5 1 8 Terminal Board Figure 49 Terminal Board 76 Appendices ...