13-2
JLN-900 Speed Log
Calibration and Sea Acceptance test. NJC-80 Sig.Processor, Transducer (TRU)
and optional Sig.Distributor
Contents
1
Scope
13-3
2
Equipment needed
13-3
3
Test procedure for bottom track (ground speed)
13-3
3.1
SOG Transducer angle calibration..............................................................................13-3
3.2 Speed Calibration (SOG) ....................................................................................................13-4
4
Test procedure for the STW unit, WTU PCB.
13-6
4.1
The boundary layer.....................................................................................................13-6
4.2
Calibration factors STW.............................................................................................13-6
4.2.1
TRU Calibration ............................................................................................13-7
4.2.2
Draught calibration (Single point calibration)...............................................13-7
4.2.3
Speed Depending Calibration (Multiple Point Calibration) ..........................13-8
5
Test procedure for optional Sig.Distributor
13-9
5.1
System signal flow .....................................................................................................13-9
6
Final inspection
13-9
7
SAT protocol
13-10
8
Protocol Multiple point calibration
13-12
Summary of Contents for JLN-900
Page 2: ......
Page 12: ...x This page is intentionally blank ...
Page 17: ...2 1 JLN 900 Technical Description ...
Page 23: ...2 7 sigbel ...
Page 30: ...2 14 This page is intentionally blank ...
Page 31: ...3 1 JLN 900 Technical Specification ...
Page 38: ...3 8 This page is intentionally blank ...
Page 39: ...4 1 JLN 900 Installation of Transducer and Bottom Parts ...
Page 59: ...4 21 Transducer and Valve Cover mounted Sea Valve fully opened ...
Page 63: ...4 25 Fig 1 3 Aligning Transducer Connecting Tube ...
Page 76: ...4 38 Mounting Sea Valve on Upper Flange DB ...
Page 81: ...4 43 Gasket Seal 2 ...
Page 83: ...4 45 Transducer and Valve Cover mounted Sea Valve fully opened ...
Page 86: ...4 48 Tube Bracket in its final position with Transducer flush seated ...
Page 88: ...4 50 Fig 2 5 Aligning Transducer Connecting Tube ...
Page 92: ...4 54 This page is intentionally blank ...
Page 93: ...5 1 JLN 900 Installation of NJC 80 Sig Processor ...
Page 150: ...6 50 This page is intentionally blank ...
Page 151: ...7 1 JLN 900 Display Technical Description ...
Page 167: ...7 17 No Name Default setting Function SD 4 2 SD 4 3 SD 4 4 there are remote systems connected ...
Page 179: ...8 1 JLN 900 Analog Display Technical Manual ...
Page 183: ...8 5 2 1 Main Dimensions NWW 828 Analog Display ...
Page 184: ...8 6 2 2 Dimmer Potentiometer connection Analog Display ...
Page 186: ...8 8 This page is intentionally blank ...
Page 187: ...9 1 JLN 900 Menu System ...
Page 208: ...9 22 This page is intentionally blank ...
Page 209: ...10 1 JLN 900 WATER TRACK Technical Manual including Menu system ...
Page 233: ...11 1 JLN 900 IEC 61162 NMEA 0183 User Guide ...
Page 254: ...11 22 This page is intentionally blank ...
Page 255: ...12 1 JLN 900 Harbour Acceptance Test ...
Page 266: ...12 12 This page is intentionally blank ...
Page 267: ...13 1 JLN 900 Calibration and Sea Acceptance Test ...
Page 280: ...13 14 This page is intentionally blank ...
Page 281: ...JLN 900 system drawings 14 1 ...
Page 289: ...CFT 780 4 TRANSDUCER 40m 14 9 ...
Page 290: ...NKF 980 Sea Valve 14 10 ...
Page 291: ...NKF 980 Sea Valve 14 11 ...
Page 292: ...NWW 82 MAIN DISPLAY 14 12 ...
Page 293: ...DISPLAY 3 1 87 14 13 ...
Page 294: ...NCM 1080 DIMMER UNIT 14 14 ...
Page 295: ...15 1 JLN 900 Description labels and drawings ...
Page 300: ...15 6 This page is intentionally blank ...
Page 301: ...16 1 Annex JLN 900 Speed Log System Manual ...
Page 302: ...16 2 Annex Table of contents ANNEX I EQUIPMENT RECYCLING 3 ANNEX II ENERGY SAVING 5 ...
Page 306: ...16 6 This page is intentionally blank ...
Page 307: ......