- 8 -
(
Figure 1.2.1
)
Step 3: connect six arms of aircraft correspondingly according to the number and
tighten them clockwise. The specific operation is shown in Figure 1.2.2.
(
Figure 1.2.2
)
Step 4: have the supportive data transmission/image transmission antenna of aircraft
installed according to the corresponding locations;
Step 5: instructions for installation of payload equipment
Take out the payloads from the packing case, and quickly install it to the drone, tighten
the quick release device. Connect power line and control line accordingly as shown in
Figure 12.3.