background image

Safety

2.4

Safety instructions for electrical work

DANGER

Electric shock due to working on electrically live components

Death or severe injuries will result.

Switch off mains voltage prior to work on voltage-carrying components and secure to prevent

switching back on!

All work which may possibly need to be performed while the system is live must only be performed by

qualified electricians certified according to an approved national scheme!

ATTENTION

Ensure that electronic or electrical system components are not damaged by splash water for example!

NOTE

Switch off the power supply before working on system components!

2.5

Safety instructions for mechanical operations

CAUTION

Before cleaning, maintenance or repair work ensure that the JUDO reverse osmosis system is

hydraulically depressurised!

NOTE

These activities must only be performed by JUDO customer service or corresponding technical

personnel, who know and understand the overall system of the device and its environment!

2.6

Product safety

When placed on the market, the product complied with the state of the art in science and technology and the

recognised technical safety regulations. The product must be used according to the specifications given under

intended use. Residual danger signs and pictographs are attached to danger points on the system. The prod-

uct must not be changed mechanically or from a safety point of view without the express agreement of JUDO

Wasseraufbereitung GmbH. Product changes of this type made by the operator or on its behalf will result in the

declaration of conformity becoming void. If the product operator performs or orders such changes, the operator or

its agent must re-evaluate the conformity and arrange for a new declaration of conformity.

07/2021 • 1703434

Bioquell

®

-PURE

9

Summary of Contents for Bioquell PURE

Page 1: ...ting instructions Translation of the original operating instructions Bioquell PURE JUDO reverse osmosis system Please transfer to the operator Read before installation and commissioning Keep for futur...

Page 2: ...Safety instructions for mechanical operations 9 2 6 Product safety 9 2 7 Duties of the operator 10 3 Product information 11 3 1 Scope of supply 11 3 1 1 Extended accessories are part of the scope of s...

Page 3: ...any queries please specify the model name order and manufacturing numbers that you can find on the type label of your JUDO device Every JUDO reverse osmosis system has been carefully checked prior to...

Page 4: ...tood these installation and operating instructions and also any separate installation and operating instructions for other devices and systems 1 2 Validity of the installation and operating instructio...

Page 5: ...sal 1 6 1 Transport CAUTION Transport the JUDO reverse osmosis system with care in an upright position do not knock over do not transport when there is a risk of frost also protect against dust and di...

Page 6: ...danger symbol Warning of electric voltage Table 2 Danger pictographs Mandatory pictographs Mandatory pictographs show actions that must be followed to prevent danger The following mandatory pictograph...

Page 7: ...a danger which if not avoided will result in death or severe injury WARNING Orange WARNING identifies a danger which if not avoided may result in death or severe injuries CAUTION Yellow CAUTION ident...

Page 8: ...inal spare parts and components are used in the combination described in these installation and operating instructions otherwise there is a risk of malfunctioning or damage Only allow authorised techn...

Page 9: ...ressurised NOTE These activities must only be performed by JUDO customer service or corresponding technical personnel who know and understand the overall system of the device and its environment 2 6 P...

Page 10: ...omplied with No conversions or changes to the product can be performed without the agreement of the manufacturer All conversions and changes must be checked and documented from a safety point of view...

Page 11: ...m receipt of goods and any hidden defects within 8 days from their detection Upon product delivery missing parts as well as missing technical documents or materials must also be reported within 8 days...

Page 12: ...3 Functional layout Fig 2 Functional layout 1 T valve water inlet 9 TDS measuring sensor outlet 2 TDS measuring sensor inlet 10 T33 activated carbon filter from coconut shells 3 PP activated carbon fi...

Page 13: ...The PP activated carbon filter removes dirt particles decomposition substances deposits sand and other parti cles to protect the RO membrane Stage 2 With a filtration fineness of 0 0001 m the reverse...

Page 14: ...nse 6 Leak sensor el connection LEAK SENSOR 18 PP activated carbon filter remaining capacity display 7 Power supply unit el connection POWER 19 Clean device display Purify 8 Opening audible signal out...

Page 15: ...bar 1 4 Water temperature C 4 30 Electrical data VAC 100 240 In Hz 50 60 Power supply via adapter Out VDC 24 Requirements for the installation site Temperature range C 4 40 Air humidity 90 Dimensions...

Page 16: ...NOTE Only designated for operation in closed spaces 4 1 Conditions for safe connection The device is equipped with a booster pump and many only be operated with clean drinking water Only operate using...

Page 17: ...tor con nected Pull off locking clip Pull back the mount ing ring and hold Pull the PE tube out of the push fit con nector 1 Locking clip blue 4 PE tube 2 Mounting ring 5 Gap for locking clip 3 PE tub...

Page 18: ...et for clean PURIFIED water Connect 1 4 push fit connectors on one side of the connections on the water tap Measure the distance between the connection at the water tap and the PURIFIED outlet Cut a 1...

Page 19: ...the water tap Close the lever for drinking water 4 4 1 Initial commissioning Upon first use open the water tap and the inlet valve If water now runs re close the water tap for 30 minutes During this t...

Page 20: ...nd an alarm tone sounds for six seconds Once the leak has been rectified the device can be restarted by plugging in the mains cable Fault If filtering or flushing continues for a period 20 minutes the...

Page 21: ...the service life of the cartridge has elapsed the cartridge must be replaced 5 2 Filter cartridge replacement NOTE To achieve an effective and efficient filtering of the water and a uniform high wate...

Page 22: ...has not been used for a long time Flush the filter cartridges for five min utes If there is no improvement replace filter cartridges Poor feed water quality Feed water quality check Water tastes bad...

Page 23: ...agents or highly volatile solvents such as thinners petrol or alcohol The use of these agents can result in cracking of the housing and discolouration Do not submerge device in water Only clean the d...

Page 24: ...seraufbereitung AG Switzerland subsidiary Industriestrasse 15 CH 4410 Liestal Tel 41 0 61 906 40 50 info judo online ch www judo online ch JUDO Wasseraufbereitung GmbH BeNeLux subsidiary Laarbeeklaan...

Reviews: