B
A
E
D
C
(12) Adjustment of hook oil amount
– 23 –
(13) Shuttle connection / disconnection and oil wick piping
1. Loosen the three set screws
.
2. Cut the harness bands
.
3. Remove the set screw
and pull the oil tank
in the direction of the arrow A.
4. Pull Part B upwards of the two lubrication pipes
and
. Take them out of the oil tank
.
5. Release the clamp
of the oil drain pipe
.
6. Loosen the set screw
and take out the driver
.
7. Loosen the set screw
.
8. Remove the set screw
and pull out the shuttle race adjust shaft
.
9. Pull the shuttle
in the direction of the arrow C and take it out.
Standard Adjustment
Procedures of disassembling