Initial operation
15
7 Initial operation
This section describes how to put the unit into operation.
NOTE
Secure the hose connections to prevent them sliding off.
Improper assembly of the hose connections may cause them to leak or slip off
the connection nozzles.
• Secure the hose connections to prevent them sliding off
• After initial operation, check all hose connections for leaks and a secure
fit
NOTE
Do not exceed the maximum filling level in the cooling water
reservoir!
The maximum fill level in the cooling water reservoir must not be exceeded.
When the unit is switched off, excess water can flow back from the external
application and overflow.
• When switching off the unit, prevent the water from flowing back from
the external application
• Insert a stopcock or hose clamp into the external circuit
The unit is unpacked.
1. Place the unit on a horizontal and firm surface.
For good ventilation and heat emission, a distance of at least 20 cm from
the wall and adjacent equipment must be maintained.
2. Connect the unit with the mains plug to a mains power outlet.
3. Connect the hoses of the external application to be cooled to the
connections of the unit.
4. Remove the cover of the cooling water reservoir.
5. Fill the cooling water reservoir with water up to the maximum mark.
6. Close the cooling water reservoir using the cover.
7. Switch unit on at the mains switch.
The pump starts to pump the water through the condenser and the external
application.
8. Observe the level in the cooling water reservoir and top up with water when
the level reaches the minimum mark.
The level should always be between the minimum and maximum marks
during operation.
The unit is ready for operation.
B