background image

4

(ill. 8)

Push up lower insulation part 3 so that

socket 1 rests in it.

(ill. 9)

Place upper insulation part 2 in position

so that its “ridge” fi ts in the slot

of the socket 1.

Then press the upper and lower insulator

parts (2 and 3) together until they

are felt to engage in each other.

ALBRECHT JUNG GMBH & CO. KG

Volmestraße 1

58579 Schalksmühle

Telefon: +49.23 55.8 06-0

Telefax: +49.23 55.8 06-2 04

kundencenter@jung.de

www.jung.de

Reviews: