C Transport and Commissioning
1
Transport
Transport can be carried out in two different ways, depending on the height of the
mast and the local conditions.
– Vertically, with the mast assembled (for low heights)
– Vertically, with the mast dismantled (for large heights), all mechanical connections
and hydraulic lines between the basic truck and the mast separated.
2
Truck laden
2.1
Centre of gravity of the truck
WARNING!
An altered centre of gravity can result in tipovers when cornering.
The overall centre of gravity can vary depending on the truck's equipment (especially
the mast version).
For trucks without a mast the centre of gravity will move significantly in the direction
of the counterweight.
u
Drive carefully and with modified speed to avoid tipping over.
The picture shows the approximate centre of gravity location.
39
10.20 en-GB
Summary of Contents for EFG 110
Page 2: ...2 ...
Page 4: ...4 10 20 en GB ...
Page 10: ...10 10 20 en GB ...
Page 23: ...Ast a 2 e a 2 W a c Q h 6 h 7 H 1 h 1 h 3 h 4 h 2 m 1 b L2 L1 y m 2 h 10 x 23 10 20 en GB ...
Page 38: ...38 10 20 en GB ...
Page 46: ...46 10 20 en GB ...
Page 56: ...The battery is now charged 56 10 20 en GB ...
Page 58: ...58 10 20 en GB ...
Page 63: ...72 71 73 69 74 75 70 69 68 67 66 64 65 63 63 10 20 en GB ...
Page 65: ...80 77 76 79 72 71 65 10 20 en GB ...
Page 172: ...172 10 20 en GB ...