4.2.1 Commissioning unfilled batteries
Z
The operations required must be carried out by the manufacturer's customer
service department or a customer service organisation authorised by the
manufacturer.
4.2.2 Commissioning filled and charged batteries
Checks and operations to be performed before starting daily work
Procedure
• Make sure the battery is in physically good condition.
• Make sure the terminals are correct (positive to positive and negative to negative)
and check that contacts on the battery terminal conducting system are secure.
• Check the M10 terminal screws of the conductors and connectors are secure and
if necessary torque to 23 ±1 Nm.
• Charge the battery, see page 13.
• Check the electrolyte level of each battery cell after charging and top up if
necessary:
• Open the plug (15).
Z
The electrolyte level should not be less than the "Min" electrolyte marking (16)
and must not exceed the "Max" (17) marking.
• If necessary, add electrolyte with pure water up to the "Max" electrolyte level
marking (17), see page 15.
• Close the plug (15).
The test is now complete.
Battery cell cross section
Top view of a battery cell
15
16
17
15
16
17
Summary of Contents for EFX 410
Page 1: ...EFX 410 413 03 13 Operating instructions 51296679 04 19 en GB EFX 410 EFX 413 ...
Page 2: ...2 ...
Page 4: ...4 04 19 en GB ...
Page 12: ...0506 GB 2 0506 GB 2 ...
Page 72: ...70 04 19 en GB ...
Page 90: ...88 04 19 en GB ...
Page 250: ...248 04 19 en GB ...
Page 261: ...The Operator specific settings menu now opens 259 04 19 en GB ...
Page 376: ......
Page 380: ...02 16 EN 6 ...
Page 382: ...02 16 EN 8 14 Safety instructions and warning information ...
Page 404: ......