7.6
Daily checks before starting the Personal Protection System
– Check the front screens of the Personal Protection System laser scanner for
contamination and clean as required (see page 240).
7.6.1
Cycle test
NOTICE
To ensure the correct operation of the personal protection system a cycle test must
be carried out after a 24 hour timer has expired or each time the truck is switched off
and on again.
u
The information message "9901" and the "Perform cycle test" symbol (130) prompt
you to perform the cycle test. During this time the travel speed is restricted to slow
travel (2,5 km/h).
u
The speed restriction is only removed when the cycle test has been performed.
Cycle test
Procedure
• Switch off the truck.
• Switch on the truck.
Z
When the truck is switched on the
display unit shows the “Acknowledge
cycle test” symbols (130,191).
• Press (104) under the "Acknowledge
cycle test" symbol (191).
The truck automatically performs the
cycle test.
• When the cycle test has been successfully performed:
• The "Perform cycle test" symbol (130,191) fades out.
• The speed restriction is removed.
• The 2424 hour timer is reset and starts afresh.
The cycle test has been performed successfully.
130
191
104
243
04.19 en-GB
Summary of Contents for EFX 410
Page 1: ...EFX 410 413 03 13 Operating instructions 51296679 04 19 en GB EFX 410 EFX 413 ...
Page 2: ...2 ...
Page 4: ...4 04 19 en GB ...
Page 12: ...0506 GB 2 0506 GB 2 ...
Page 72: ...70 04 19 en GB ...
Page 90: ...88 04 19 en GB ...
Page 250: ...248 04 19 en GB ...
Page 261: ...The Operator specific settings menu now opens 259 04 19 en GB ...
Page 376: ......
Page 380: ...02 16 EN 6 ...
Page 382: ...02 16 EN 8 14 Safety instructions and warning information ...
Page 404: ......