4.3.3 Weekly
– After re-charging, carry out a visual inspection for dirt and physical damage.
– If the battery is charged regularly according to the IU characteristic, carry out a
compensation charge.
4.3.4 Monthly
– Towards the end of the charging process measure and record the voltages of all
the cells with the charger switched on.
– After charging measure and record the electrolyte density and the electrolyte
temperature in all the cells.
– Compare the results with the previous ones.
Z
If you find significant differences compared with the previous measurements or
differences between the cells, contact the manufacturer's customer service
department.
4.3.5 Annually
– Measure the insulation resistance of the truck in accordance with EN 1175-1.
– Measure the insulation resistance of the battery in accordance with DIN EN 1987-1.
Z
In accordance with DIN EN 50272-3 the battery insulation resistance should not be
less than 50 Ω per volt of rated voltage.
Summary of Contents for EJC 212z
Page 2: ...2 ...
Page 4: ...4 04 19 en GB ...
Page 10: ...10 04 19 en GB ...
Page 12: ...0506 GB 2 0506 GB 2 ...
Page 27: ...EJC 212z 214z 216z 220z D 25 04 19 en GB ...
Page 50: ...48 04 19 en GB ...
Page 74: ...72 04 19 en GB ...
Page 135: ...Z This setting can be changed if required 133 04 19 en GB ...
Page 193: ...Z After adding hydraulic oil tighten the lock to 10 Nm M 10Nm 191 04 19 en GB ...
Page 195: ...115 113 114 112 193 04 19 en GB ...
Page 226: ...02 16 EN 6 ...
Page 228: ...02 16 EN 8 14 Safety instructions and warning information ...
Page 250: ......