C 1
060
0.GB
C Transportation and commissioning
1
Transportation by crane
m
Only use lifting gear of adequate capacity
(loading weight
=
dead weight
+
battery weight;
see truck identification plate).
A
A lifting eye (1) is provided on the fork side of the mast for loading the truck using
crane gear.
- Park the truck and render it safe
(see chapter E, section 4.5).
- Attach the crane gear to the lifting eye (1).
m
The crane gear must be attached to the lifting eye
in such a manner that it cannot slip!
The crane gear must be attached in such a
manner that it does not touch any attachments
during lifting.
2
Commissioning
m
The truck must only be operated on battery
current! Rectified alternating current will damage
the electronic components. Cables connected to
the battery (trailing cables) must be less than 6 m
in length.
To prepare the truck for operation after delivery or
transportation, the following operations must be
performed:
- Check the equipment for completeness.
- If necessary, install the battery. Make sure that the battery cable is not damaged.
- Charge the battery (see chapter D, section 3).
- Put the truck into operation in the stipulated manner (see chapter E, section 3).
A
When the truck is parked, the surface of the tyres may flatten. The flattening will
disappear after the truck has been operated for a short time.
1
C 1
060
0.GB
C Transportation and commissioning
1
Transportation by crane
m
Only use lifting gear of adequate capacity
(loading weight
=
dead weight
+
battery weight;
see truck identification plate).
A
A lifting eye (1) is provided on the fork side of the mast for loading the truck using
crane gear.
- Park the truck and render it safe
(see chapter E, section 4.5).
- Attach the crane gear to the lifting eye (1).
m
The crane gear must be attached to the lifting eye
in such a manner that it cannot slip!
The crane gear must be attached in such a
manner that it does not touch any attachments
during lifting.
2
Commissioning
m
The truck must only be operated on battery
current! Rectified alternating current will damage
the electronic components. Cables connected to
the battery (trailing cables) must be less than 6 m
in length.
To prepare the truck for operation after delivery or
transportation, the following operations must be
performed:
- Check the equipment for completeness.
- If necessary, install the battery. Make sure that the battery cable is not damaged.
- Charge the battery (see chapter D, section 3).
- Put the truck into operation in the stipulated manner (see chapter E, section 3).
A
When the truck is parked, the surface of the tyres may flatten. The flattening will
disappear after the truck has been operated for a short time.
1
Summary of Contents for EMC 110/B 10
Page 1: ...Operating instructions 10003627 EMC 110 B 10 G 06 96 07 08...
Page 3: ...0108 GB...
Page 7: ...0506 GB 2...
Page 9: ...0600 GB A 2...
Page 14: ...B 5 0708 GB C Q h 1 h 3 h 13 l2 y 150 l1 Ast b 1 Wa b 1 b 2 b 5 e b 4...
Page 26: ...E 3 0600 GB 5 2 1 10 11 6 8 9 4 3 7...
Page 33: ......
Page 73: ...0506 GB 18...