4. On the inside of the container, put the nut over
the bulkhead and hand tighten as much as you can.
Then use a wrench to gently turn half rotation.
There should be a small marked compression on
the o-ring. Remember, only slight! DO NOT over
tighten or you will skip the thread and possibly
damage the bulkhead.
5. Once you install the reservoir bulkhead it will
look like in the photo. Plug in a piece of tubing or a
plug into the newly installed reservoir bulkhead.
Test for leaks by filling up the container with water
and leaving it for 30min. Connection should be
completely water tight.