Site Preparation Checklist for ACX2000 and ACX2100
Routers
The checklist in
summarizes the tasks you need to perform when preparing a site for
router installation.
Table 22: Site Preparation Checklist
Date
Performed By
For More Information
Item or Task
Environment
“ACX2000 and ACX2100 Router Environmental
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
Power
Measure the distance between external
power sources and router installation site.
Locate sites for connection of system
grounding.
“ACX2000 and ACX2100 DC Power Specifications” on
“ACX2100 AC Power Specifications” on page 62
Calculate the power consumption and
requirements.
Hardware Configuration
“ACX2000 and ACX2100 Universal Metro Router
Choose the number and types of routers
you want to install.
Rack or Cabinet
“Rack Requirements for ACX2000 and ACX2100
“Cabinet Requirements for ACX2000 and ACX2100
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the router.
68
Summary of Contents for ACX2000
Page 1: ...ACX2000 and ACX2100 Universal Metro Router Hardware Guide Published 2020 09 07 ...
Page 91: ...Front Panel of an ACX2000 Router 47 LEDs on ACX2000 and ACX2100 Routers 57 91 ...
Page 116: ...4 CHAPTER Maintaining Components Maintaining ACX2000 and ACX2100 Components 117 ...
Page 125: ...5 CHAPTER Troubleshooting Hardware Troubleshooting ACX2000 and ACX2100 126 ...
Page 139: ...139 ...
Page 144: ...Restricted Access Warning 144 ...
Page 148: ...148 ...
Page 161: ...Jewelry Removal Warning 161 ...
Page 164: ...Operating Temperature Warning 164 ...
Page 174: ...DC Power Disconnection Warning 174 ...
Page 178: ...DC Power Wiring Sequence Warning 178 ...