Site Preparation Checklist for ACX500 Routers
summarizes the tasks you need to perform when preparing a site
for ACX500 router installation.
Table 18: Site Preparation Checklist
Item or Task
For More Information
Performed by
Date
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
"ACX500 Router Environmental
Specifications" on page 89
Power
Measure the distance between external
power sources and router installation site.
Locate sites for connection of system
grounding.
"ACX500 Router Grounding
Specifications" on page 91
Calculate the power consumption and
requirements.
"ACX500 DC Power
Specifications" on page 73
Hardware Configuration
Choose the number and types of routers
you want to install.
"ACX500 Universal Metro Router
Overview" on page 2
Rack, Cabinet, Wall or Pole