Clearance Requirements for Airflow and Hardware Maintenance on
ACX500 Routers
IN THIS SECTION
ACX500 Indoor Router Chassis Dimensions and Clearance Requirements | 80
ACX500 Outdoor Router Chassis Dimensions and Clearance Requirements | 81
ACX500 Outdoor Router with PoE Chassis Dimensions and Clearance Requirements | 84
ACX500 Indoor Router Chassis Dimensions and Clearance Requirements
Prepare your site for installation by observing the following guidelines:
• When planning the installation site, allow sufficient clearance around the rack. See
.
• For service personnel to remove and install hardware components, allow at least 2.16 in. (5.5 cm) in
front of the router.
• The rack or cabinet must have an adequate supply of cooling air.
• Ensure that the cabinet allows the chassis hot exhaust air to exit from the cabinet without
recirculating into the router.
• When deploying the router in harsh environments allow a 1–rack unit (U) gap above and below the
router.
80