background image

PTX10001-20C Quick Start

PTX10001-20C Quick Start

See the complete PTX Series documentation at

http://www.juniper.net/techpubs/

. To install and configure a Juniper Networks

PTX10001 Router, you need:

Electrostatic discharge (ESD) grounding strap (not provided)

One pair of front mounting rails (provided)

One pair of rear mounting blades (provided)

Sixteen screws to secure the mounting rails and mounting blades to the chassis (provided)

Eight screws to secure the chassis and mounting blades to the rack (not provided)

Screwdriver appropriate for your rack mounting screws (not provided)

Two power cords with plugs appropriate for your geographical location (provided)

RJ-45 cable and RJ-45 to DB-9 serial port adapter (provided)

Management host, such as a PC laptop, with a serial port (not provided)

(Optional) Grounding cable kit with bracket, lug, and three screws. To install the grounding cable, see the PTX10001
documentation at

https://www.juniper.net/documentation/product/en_US/ptx10001

Part 1: Mount the Device

The PTX10001 can be mounted in a 19-inch four-post rack.

To mount the device in a standard 19-inch rack:

1.

Attach the ESD grounding strap to your bare wrist and to a site ESD point.

NOTE:

If you are mounting multiple units in the rack, mount the heaviest unit at the bottom and mount the others

from bottom to top in order of decreasing weight. The PTX10001-20C weighs approximately 26.8 lbs (12.2 kg).
Installing the router in a rack requires two people to lift the device and secure it to the rack.

2.

Place the rack in its permanent location, allowing adequate clearance for airflow and maintenance, and secure it to the building
structure.

3.

Determine whether the end with field replaceable units (FRUs) or the ports are to be placed at the front of the rack.

4.

Align the holes in the mounting-rail with the holes on the side of the chassis.

Reviews: